Hanworth Battery 4.8 GWh seeks approval in Australia
The 4.8 GWh Hanworth Battery will have 1.2 GW of power and four hours of storage for the Australian electricity grid.
Moises Carrasquero is a mechanical engineer and writer specializing in technology, engineering, and industrial development, with a focus on the advancements that are transforming these sectors. My goal is to turn complex technical information into clear, accurate, and relevant journalistic content.
The 4.8 GWh Hanworth Battery will have 1.2 GW of power and four hours of storage for the Australian electricity grid.
Europe's largest carbon capture plant will be able to capture 800,000 tons of CO2 annually at the Yara Sluiskil facilities.
Vector Geophysical will deploy 30,000 STRYDE seismic nodes to bolster high-density ground-based data acquisition in Colombia.
The offshore campaign completes the foundations of 100 wind turbines and advances the construction of Bałtyk 2 and 3 in the Baltic Sea.
ABS will support the Aura Sul Wind project, which includes an 18 MW floating wind turbine off the coast of Rio Grande do Sul.
Nvidia acquires Hugging Face for $12.9 billion to expand its AI ecosystem and strengthen its position in technology infrastructure.
Low gas reserves in Europe increase pressure for LNG and competition with Asia ahead of winter.
US LNG exports grew 23% during the first half of 2026 due to increased liquefaction capacity.
The Cangnan No. 6 offshore wind project will reach 300 MW with an estimated investment of $457 million.
Shell and BP are making progress in Conifer and Tupinambá with new stakes and upcoming offshore exploration drilling.
Kim Heng and Heungwoo Industrial will create Heungwoo Thaitan to develop pipeline, HDD and offshore construction work in Korea.
Acta Gemini will support the commissioning and maintenance of RWE's Sofia offshore wind farm in the North Sea.