JAPEX Completes Natural Gas Exploratory Drilling in Hokkaido
The petroleum firm rules out immediate commercial exploitation after evaluating the volume of resources detected off the coast of Hidaka.
The petroleum firm rules out immediate commercial exploitation after evaluating the volume of resources detected off the coast of Hidaka.
The Ukrainian corporation gains access to the global liquefied natural gas market to secure strategic supply between 2033 and 2044.
The vessel MS Letitia completed a test trajectory under real maritime traffic conditions within the framework of the European MAGPIE project.
The 1.6-gigawatt complex located in the German North Sea has assembled its first 15-megawatt generation unit.
The supply contract for the Rabbit's Foot project brings the joint capacity agreed upon by both corporations to 872 megawatts.
The U.S.-based company will deploy two large-scale carousels for the management and long-term storage of umbilical systems in the international market.
The 1.4-gigawatt offshore infrastructure begins its technical testing phase after assembling 14-megawatt wind turbines.
The French company validates its full-scale floating demonstrator in a testing campaign supervised by the Irish energy utility ESB.
The alliance establishes the commercial basis for the development of a 3000 MW power generation plant in Richards Bay.
The company will provide comprehensive on-site technical services for an initial period of six years with an option for extension up to twelve years.
The German manufacturer will provide compact lifting equipment equipped with digital remote maintenance technology to optimize three Dutch transmission platforms.
The Department of Energy establishes a national strategy to deploy commercial pilot plants by the mid-2030s.