Cima TQ presents an analysis of the future of corrosion at AMPP 2026
Throughout his career, he has seen how mechanical integrity management has evolved, but he maintains the premise that doing the job right is the only way to ensure safety.
Throughout his career, he has seen how mechanical integrity management has evolved, but he maintains the premise that doing the job right is the only way to ensure safety.
Close collaboration with local personnel in Thailand ensures that technical and operational requirements are met with precision before operations begin in 2028.
The geophysical data acquisition program in blocks 2, 3, and 4 aims to reduce exploration risk in unexplored areas.
The experience the company has built up since 1997 has been a decisive factor in consolidating its position as a reliable provider across the hydrocarbons lifecycle.
The alternative seeks to leverage previous studies and approved zoning to foster local economic activity in a different way.
Formally launched in May 2024, this project has achieved startup in less than 24 months.
The contract to convert the LNGT Karadeniz vessel will enable processing of up to 600 million cubic feet per day of natural gas.
Technical reports indicate that the goal is to prevent the release of approximately 20 million tons of CO2 into the atmosphere over a fifteen-year period.
PTTEP awards SLB OneSubsea contract for integrated systems supply for Kikeh 3B subsea development off the coast of Malaysia.
This massive delivery reaffirms the firm's position as a strategic ally in the transition and stability of today's offshore market.
The technique captures methane emissions that would otherwise end up in the atmosphere, strictly complying with the European Union’s Renewable Energy Directive.
The signing of these preliminary protocols took place within a framework of diplomatic rapprochement toward the Caribbean nation.