Bideford Dolphin drilling rig to be sold for scrap metal

Share on social networks

Venderán la plataforma de perforación Bideford Dolphin como chatarra

Dolphin Drilling announced its intention to sell for scrapping its Bideford Dolphin drilling rig, which has 49 years of service. Built in 1975 and undergoing modifications in 1998, the platform has been managed by Dolphin Drilling during its operation.

The purpose of decommissioning the drilling platform

The company has also stated that this measure is in line with its strategy to optimize the fleet and improve operating efficiency. In a statement issued a few days ago, Dolphin Drilling indicated that the oil platform will be dismantled in a responsible manner, following current international standards.

It should be noted that Dolphin Drilling maintains four upgraded fourth and fifth generation Aker H3 and H4 units in its fleet, which include the Borgland Dolphin platforms, Blackford Dolphin Paul B. Loyd, Jr. and Dolphin Leader.

La NASA y Nokia luna
Venden el perro robot lanzallamas por menos de 10.000 dolares
Compania japonesa encarga 50 autos voladores a Embraer
Robot trepador de paredes para inspeccion de buques obtiene aprobacion de ClassNK
El robot Atlas de Boston Dynamics volvio repotenciado
Internet on the Moon? Nokia and NASA will make it possible
Flamethrower robot dog sold for less than $10,000
Japanese company orders 50 flying cars from Embraer
Wall Climbing Robot for Ship Inspection Gets ClassNK Approval
Boston Dynamics’ Atlas robot returned repowered
PlayPause
previous arrowprevious arrow
next arrownext arrow
 

The company’s decision to decommission the Bideford Dolphin rig underscores the challenges facing the offshore drilling industry at a time when sustainability and efficiency are becoming key priorities. This move reflects a shift in the industry towards modernization and environmental responsibility, marking the end of an era for traditional drilling rigs.

Dolphin Drilling’s current situation

Dolphin Drilling is currently involved in litigation before the Supreme Court, having lost an appeal in the Court of Appeals. The legal dispute, which has dragged on for years with HMRC, could have significant consequences for the operation of hundreds of rigs and vessels in the UK maritime sector.

The company has appealed for support from fellow British rig owners, sending a memo to members of the British Association of Platform Owners and the UK Chamber of Shipping, urging them to back its petition for a Supreme Court hearing. The Court of Appeal’s decision in December sets a precedent with broad implications on tax deduction claims in the sector under corporate tax law.

This legal dispute arose from a 2014 agreement between HMRC and Dolphin after TotalEnergies contracted the Borgsten Dolphin platform in the North Sea.

Stephen Cox, the company’s CFO, has pointed out that this case could significantly expand the scope of taxation, affecting other assets and companies and extending HMRC’s powers, which he believes is detrimental to the industry.

Don’t miss any of our posts and follow us on social media!

Inspenet.com YouTube LinkedIn Facebook Instagram

Source: energyvoice.com

Photos: shutterstock

Share this news on your social networks

Rate this post
1 star2 stars3 stars4 stars5 stars (No rating yet)
Loading...