New Energies
This is how the last boiler was blown up at the Carboneras thermal power plant.
The process required the use of 260 detonators, 175 kilos of explosive and 158 linear cutting charges.
Renewable technologies, transition projects and low-carbon solutions transforming the future of energy.
Access our complete technical library, guides, and in-depth analyses.
Discover all our interviews, reports and video event coverage.