New Energies
Minesto expands Dragon 12’s potential with greater efficiency
A 10-meter longer cable on Dragon 12 allowed a 25% increase in power generation, validating Minesto's technical simulations.
Renewable technologies, transition projects and low-carbon solutions transforming the future of energy.
Access our complete technical library, guides, and in-depth analyses.
Discover all our interviews, reports and video event coverage.