Maritime
DeepOcean installs 400-ton structure in Irpa field
The operation used 95% of the Edda Freya's crane capacity to install the 400-tonne structure at a depth of 1,350 meters.
Marine terminals, offshore logistics and port infrastructure supporting global energy transport.
Access our complete technical library, guides, and in-depth analyses.
Discover all our interviews, reports and video event coverage.