Shearwater and Searcher Complete 3D Seismic Acquisition in the Pelotas Basin in Brazil
The results delivery schedule is strategic for 2026 investment plans.
The results delivery schedule is strategic for 2026 investment plans.
Hynfra and Topsoe begin designing a green ammonia plant at the Port of Aqaba to strengthen Jordan’s energy sovereignty.
The primary destination for this production will be the markets of the European Union and the United Kingdom.
The plant will utilize PEM technology and hydroelectric power to decarbonize the Canadian mining supply chain.
The West Polaris is a precision tool designed to operate in the most demanding environments on the planet.
Interest from various international investors suggests that confidence in Gevo's business model is solid
The transaction complies with current European Union regulatory frameworks on market abuse.
The company will manage the technical supervision of 1440 MW in the Baltic Sea to supply clean energy to two million Polish households.
Maintenance crews are focusing their efforts on replacing critical components.
The PV DRILLING IX jack-up rig begins operations in April to enhance hydrocarbon extraction and regional energy security.
The facility has two specialized electrolyzers, a polymeric membrane electrolyzer and a high temperature solid oxide electrolyzer.
The final investment decision is estimated for the 2026/2027 fiscal period, at which time the collaboration is expected to move into a definitive manufacturing and construction phase.