Damaged turbine affects offshore wind projects in New York

Inspenet.

Share on social networks

Turbina dañada afecta proyectos de energía eólica marina en Nueva York

The offshore wind energy industry in the United States faced a new setback last week due to the lack of availability of the required turbine, marking a significant setback for the development of three key projects in New York, which represented a combined total of 4 GW, i.e. around two-thirds of the projects underway in that region.

Setbacks in offshore wind projects

This situation has been widely attributed to the non-existence of 18 MW turbines , which triggered a series of events that led to the conclusion of the negotiations. This setback represents a notable setback for an industry that, although it had shown signs of progress after facing difficulties the previous year due to factors such as inflation, high interest rates and supply chain problems, now faces the challenge of meeting the ambitious goals of offshore wind power both at the national and state level.

According to BloombergNEF analyst Atin Jain, the cancellation of negotiations means that New York state now has 1.7 GW of offshore projects in development, insufficient to reach the state’s goal of 9 GW by 2035 .

La nueva generacion del robot Phoenix fue presentada
Cientificos prueban tecnologia para refrescar el planeta
Terminal maritima del sur de Brooklyn sera un centro de energia eolica marina
Crean robot monociclo con patas llamado Ringbot
BionicBee abejas robots ultraligeras de vuelo autonomo
The new generation of the Phoenix robot was presented
Scientists test cloud whitening to “refresh the planet”
South Brooklyn Marine Terminal to Be Center for Offshore Wind Energy
They create a unicycle robot with legs called Ringbot
BionicBee: autonomously flying ultralight robot bees
PlayPause
previous arrowprevious arrow
next arrownext arrow
 

For its part, the New York State Energy Research and Development Authority explained that the decision to end the negotiations was based on the inability of GE Vernova Inc. to supply the 18 MW turbines required for the projects. Investors involved include units of Copenhagen Infrastructure Partners P/S, TotalEnergies SE, Rise Light & Power LLC, National Grid Plc and RWE AG.

Changes and challenges in planning and costs

Initially, GE had announced that it would manufacture 18 MW turbines, but in late 2023, in light of reliability concerns, the company decided to limit itself to 16.5 MW turbines, resulting in a change to the original plans.

Both turbine variants have 250-meter rotors, and according to a company representative, wind farms equipped with smaller turbines could actually generate more electricity, reflecting the challenging market conditions that influenced the conclusion of the negotiations. contractual.

The lack of larger turbines has forced developers to rethink their projects, opting for smaller turbines, resulting in a greater number of foundations and cables, therefore, higher costs.

The continuity of offshore wind projects in New York

Despite the cessation of contract negotiations, developers have expressed a willingness to collaborate with New York on future bids, suggesting that the projects are not completely off the table and could still move forward with adjustments to their designs and implementation strategies.

The situation highlights the critical importance of strategic planning and risk management in large-scale renewable energy projects, as well as the need for greater diversification and redundancy in the supply chain of key components to mitigate the impact of potential setbacks in the future.

Follow us on social networks and don’t miss any of our publications!

Inspenet.com YouTube LinkedIn Facebook Instagram X

Source: gcaptain.com

Photo: Shutterstock

Share this news on your social networks

Rate this post
1 star2 stars3 stars4 stars5 stars (No rating yet)
Loading...