
UK closes Ratcliffe-on-Soar coal-fired power station (the last in the country)
This brings to an end 142 years of coal-fired power generation in the UK.

This brings to an end 142 years of coal-fired power generation in the UK.

The Matarani plant covers an area of 750,000 square meters, equivalent to the size of more than 70 hectares of forest.

The virtual pipeline represents a major step forward for Spain's energy infrastructure, helping to develop new sources of clean energy and reducing dependence on fossil fuels.

The Heyden 4 power plant generated enough energy to power more than 2 million homes a year for more than 30 years.

The terminal will have 13,000 solar panels, covering an area equal to six football fields and generating 6.63 MW of energy.

This would be the world's first geopressurized geothermal plant (GGS).

Each sector has approximately 150 km of welding seams.

CRRC's floating wind turbine is the largest in the world, capable of generating 40 kWh per rotation with a 260-meter rotor.

The project is part of the LEAP program, co-developed by Google, which accelerates the execution of clean energy deals in record time.

This project will allow Argentina to continue developing technical capabilities that will position it for future nuclear projects.

The main reason has been the insufficient interest on the part of qualified companies to participate in the sale of leasing rights.

The plant will prevent the emission of 56,000 tons of CO2 per year.