Amplus moves the emblematic FPSO Petrojarl I to Las Palmas for reactivation
Petrojarl I is the most redeployed FPSO in the offshore industry.
I am a civil engineer and I work in the writing area. I have a deep passion for civil works. I constantly seek to update myself on new engineering technologies to integrate them into my work, since my main interest is exploring how innovations in the industrial sector can improve and transform the world.
Petrojarl I is the most redeployed FPSO in the offshore industry.
The floating solar cage makes it possible to avoid the emission of up to 350 tons of CO₂ per year.
The new plant will generate up to 23,000 tons of green hydrogen per year and avoid 150,000 tons of CO₂.
The Agogo FPSO will produce 175,000 barrels per day from Block 15/06.
LEVA crouches with millimeter precision on boxes, hooks hidden hooks and lifts them from below as if they were part of his body.
Infinity Two is designed to operate for two years at a time, with only 30 days of planned maintenance.
The complex will produce 800,000 tons per year of green ammonia and methanol from hydrogen generated with renewable energies.
The Deep Blue was raised 3.7 meters to check its eight thrusters at Gibdock Dock No. 1.
FedEx will cover approximately 20% of its annual fuel consumption at LAX with SAF supplied by Neste.
The new operations center will coordinate the work of more than 300 employees in two shifts from a single building.
The estimated amount of gas is equivalent to three months of current U.S. consumption.
The plant will have the capacity to produce 60,000 tons of green hydrogen per year, avoiding 1,628,000 tons of CO₂.