Canacol Energy announces new natural gas discovery in the Lulo 2 Well

Inspenet.

Share on social networks

inspenet - 1923

Inspenet, June 6, 2023

Canacol Energy reported that a natural gas discovery was made in the Lulo 2 evaluation well – located in the VIM21 Exploration and Production (E&P) contract.

According to the company’s data, to give the positive result, a total depth of 7,112 feet was reached, measured on June 1, 2023.

Terminal maritima del sur de Brooklyn sera un centro de energia eolica marina
Crean robot monociclo con patas llamado Ringbot
BionicBee abejas robots ultraligeras de vuelo autonomo
Presentan a Astribot S1 un robot humanoide con IA ultra veloz
uOne un robot hibrido para operaciones de inspeccion submarina resultado
South Brooklyn Marine Terminal to Be Center for Offshore Wind Energy
They create a unicycle robot with legs called Ringbot
BionicBee: autonomously flying ultralight robot bees
Astribot S1 presented: a humanoid robot with ultra-fast AI
uOne: a hybrid robot for underwater inspection operations
PlayPause
previous arrowprevious arrow
next arrownext arrow
 

Successful exploration: Canacol Energy reveals promising results from Lulo 2 well

The well encountered a true depth of 230 feet of natural gas (container net pay) with an average porosity of 20% within the primary Ciénaga de Oro (CDO) sandstone reservoir.

Canacol said it is preparing to case and complete the well and will then connect it directly to permanent production through the Jobo gas treatment plant, located just fifty meters from the Lulo drilling rig.

1923 Canacol Energy gas pozo Lulo 2

Canacol Energy gas sales in May

Realized contractual sales of natural gas (which are gas produced, delivered and paid for) were 189 million standard cubic feet per day for May 2023, flat against sales for the same month in 2022.

Canacol Energy, gas discoveryCanacol Energy, gas discovery.

For its part, Canacol Energy assured that, after completing the Lulo 2 well, the corporation will mobilize the platform to begin drilling the Piña Norte 1 exploration well, located approximately 300 meters southwest of the Jobo production facility.

Piña Norte 1 is also in the VIM21 E&P contract, 100% operated.

The Piña Norte prospect, like Lulo, is one of five exploration prospects targeting the Middle and Lower CDO sandstone reservoir at depths of approximately 9,000 feet located in close proximity to the company’s main production facilities at Jobo. .

If successful, as in the case of Lulo, these near-field exploration prospects can provide new commercial production within weeks of discovery. Canacol Energy expects results from Piña Norte 1 by mid-July 2023.

It must be said that Piña Norte 1 will be followed by the drilling of the Cereza 1 exploration well, located approximately one kilometer north of the Jobo production facilities.

The gas company is drilling the Clarinete 8 development well, located in its VIM5 Exploration and Exploitation Contract, 100% operated. Clarinet 8 is anticipated to be completed and linked to permanent production by the end of June 2023.

Canacol Energy’s current drilling program is focused on adding additional natural gas production capacity, which will be available to consumers ahead of the El Niño season in the second half of 2023, when gas demand is anticipated to be high.

Source and photos : Canacol

Don’t miss the Inspenet News at: https://inspenet.com/en/inspenet-tv/

Share this news on your social networks

Rate this post
1 star2 stars3 stars4 stars5 stars (No rating yet)
Loading...