Projects to modernize Puerto Rico’s electrical grid advance

Inspenet.

Share on social networks

inspenet - 1621

Inspenet, April 5, 2023

The head of Energy of the United States , Jennifer Granholm, visited the island and highlighted the progress made regarding the number of projects approved and under construction for the modernization and recovery of the vulnerable electrical network of Puerto Rico.

“We have a lot of work to do, but the process is moving forward,” he stressed at a press conference at the end of his visit, adding that there were 44 projects approved in September and 116 in March.

La nueva generacion del robot Phoenix fue presentada
Cientificos prueban tecnologia para refrescar el planeta
Terminal maritima del sur de Brooklyn sera un centro de energia eolica marina
Crean robot monociclo con patas llamado Ringbot
BionicBee abejas robots ultraligeras de vuelo autonomo
The new generation of the Phoenix robot was presented
Scientists test cloud whitening to “refresh the planet”
South Brooklyn Marine Terminal to Be Center for Offshore Wind Energy
They create a unicycle robot with legs called Ringbot
BionicBee: autonomously flying ultralight robot bees
PlayPause
previous arrowprevious arrow
next arrownext arrow
 

Together with the governor of Puerto Rico, Pedro Pierluisi, the secretary also indicated that the number of initiatives under construction to improve the electrical network has gone from 29 to 43 in the same period.

Destroyed by Hurricane Maria in 2017, Puerto Rico’s power grid remains very fragile, causing frequent blackouts and has led to a boom in solar panel installation.

Pierluisi highlighted that, thanks to the new grant from the Federal Department of Energy, the Central Office for Recovery, Reconstruction and Resilience (COR3) presented a plan for the use of 3.7 million dollars, which will be available for five years under the program prevention of electrical interruptions.

“We have identified organizations and entities in different parts of the island, including our mountainous area, that have projects already advanced and need financial support to complete the development of the microgrids,” he added.

In this sense, the governor explained that the microgrid project for the islands of Vieques and Culebra will consist of 12.5 megawatts and three, respectively.

“The Vieques and Culebra microgrids will involve the modernization of existing generation, improvements to the energy transmission and distribution infrastructure, and the construction of two photovoltaic microgrids with battery systems to provide all the electricity the islands need,” he specified.

In addition, Pierluisi announced a collaborative agreement to develop a short- and long-term project that seeks to promote the use of electric vehicles on the municipal islands.

The governor concluded the press conference by assuring that he hopes that for this year the island will have “close to 2,000 extra megawatts that come from renewable energy.”

Source : https://quepasamedia.com/noticias/vida-y-estilo/bolsillo/avanzan-los-proyectos-para-modernizar-la-fragil-red-electrica-de-puerto-rico/

Photo: ShutterStock

Don’t miss the Inspenet News at: https://inspenet.com/inspenet-tv/

Share this news on your social networks

Rate this post
1 star2 stars3 stars4 stars5 stars (No rating yet)
Loading...