Pelagic Walu begins outfitting phase after launching

Pelagic Walu will integrate methanol and 2800 kWh batteries for energy-efficient offshore missions in complex marine conditions.
Pelagic Walu entra en fase de equipamiento

Pelagic Partners has taken a further step towards strengthening its sustainable fleet with the launch of the Pelagic Walu, a 93-meter, hybrid-powered commissioning operations vessel (CSOV). hybrid propulsionThe new vessel is a 93-meter long, methanol-fueled CSOV.

The event, which took place on October 18 at Cochin Shipyard, marks the beginning of the outfitting phase of the vessel, which will soon be ready for integration into offshore demanding offshore operations. demanding offshore operations.

Engineering for extreme environments

The Pelagic Walu has been designed to facilitate the commissioning, installation and maintenance of offshore platforms. offshore platformsplatforms, including wind farms. Its propulsion system combines methanol-ready main engines and a 2800 kWh lithium-ion battery bank, allowing for flexible energy management, considerable emission reductions and increased operational efficiency.

In addition, it incorporates a dynamic positioning system (DP2) and a (DP2) and a motion-compensated transfer gateway that ensures safe access for technicians even in adverse weather conditions, consolidating its profile as a key unit for critical offshore operations.

Pelagic Walu and commitment to sustainability

According to statements by Pelagic Wind Services CEO Andre Groeneveld, the addition of the Pelagic Walu represents a practical contribution to advancing the energy transition. This vessel is part of a larger program financed by the Pelagic Wind Fund, which calls for the construction of six new CSOV vessels to be delivered by Cochin Shipyard starting in 2026.

This strategic approach consolidates Pelagic Partners as a major player in driving cleaner and more resilient maritime solutions, with a fleet built to meet the technical, environmental and operational challenges of the offshore energy sector.

Ready to lead the offshore operations of the future

With its rugged hull now completed, the Pelagic Walu is now in full outfitting stage. Once operational, it will be used to support the commissioning and maintenance of marine energy infrastructures in highly complex locations.

This new CSOV reflects Pelagic Partners’ vision to lead with sustainable technology solutions and high service capability, reinforcing its commitment to an efficient and environmentally responsible offshore industry.

Source and photo: Pelagic Partners