HSM Offshore Energy completes loading and offshore deployment of ONE-Dyas platform N05-A

The N05-A platform will be the first in the North Sea to be powered entirely by marine renewable energy.
Share on social networks
La planificación y construcción de la plataforma N05-A

HSM Offshore Energy has announced with satisfaction the successful loading and subsequent offshore transfer of the topside and jacket of N05-A platform, destined for ONE-Dyas. This important step took place at its shipyard located in Schiedam, The Netherlands.

Construction of the N05-A platform

To carry out this operation, the upper structure and the platform base were placed on the barge H-406, owned by Heerema Marine Contractors. The maneuver was carried out with the help of self-propelled modular transporters(SPMT), managed by the company Mammoetunder the company’s supervision. The next destination for these structures is their location in the North Sea, where the platform is expected to start producing gas by the end of 2024.

“This landmark event is important for HSM Offshore Energy and highlights our dedication to creating solutions in the offshore energy industry. The successful loading and commissioning of the deck vessel and N05-A deck is a testament to our team’s expertise and commitment to perfection. We are excited to contribute to the energy transition and a sustainable energy mix with this innovative project.”

Hans Leerdam, commercial director of HSM Offshore Energy.

The N05-A project is a major investment in offshore infrastructure, with the construction of a platform consisting of a topside and a six-legged unarmored jacket. The topside measures 61.5 x 34 x 15 meters and weighs 3200 tons, while the jacket measures 40 x 20 x 50 meters and weighs 2800 tons.

The future of gas production in the Netherlands

Once N05-A is fully operational, it will become the first electrified gas production facility in the North Sea, powered exclusively by renewable energy from the Riffgat offshore wind farm. This development is a breakthrough and a solid technological step forward for HSM Offshore Energy, strengthening its commitment to local gas production. local gas production in the Netherlands in the Netherlands and its leadership in the transition to clean energy.

The N05-A platform, designed to operate autonomously, will function as an unmanned facility(NNMI). In addition, its infrastructure will include a gas pipeline that will connect to the existing Noordgastransport(NGT) network, thus facilitating gas distribution and improving services to its future customers in the Netherlands and Germany.

Follow us on social networks and don’t miss any of our publications!

YouTube LinkedIn Facebook Instagram X

Source and photo: HSM Offshore Energy

Share this news on your social networks
Rate this post
1 star2 stars3 stars4 stars5 stars (No rating yet)
Post Rating LoaderLoading...