
New wind farm construction approved in Sweden
The Storåsen wind farm will cover 50% of the energy needs of the green hydrogen plant at the Ljungaverk hydrogen plant.

The Storåsen wind farm will cover 50% of the energy needs of the green hydrogen plant at the Ljungaverk hydrogen plant.

The installed turbine has a swept area exceeding 53,000 m2, equivalent to the size of 7.4 standard soccer fields.

The park could generate up to 10 TWh of emission-free electricity, enough to cover more than 10% of Sweden's current electricity consumption.

The Guarango wind farm will contribute to reducing carbon dioxide emissions in Peru by approximately 230,000 tons per year.

The combined output of the two offshore wind projects will be the largest in power generation in the state in more than 35 years.

By 2025, the three 10 MW wind turbines of the Eolmed wind farm will produce more than 110 million kWh/year, enough for 50,000 inhabitants.

The Baltic Eagle wind farm will reduce approximately 800,000 tonnes of CO₂ emissions annually.