
NKT starts construction of extrusion tower at world’s largest cable plant
The tower under construction in Karlskrona will become the second tallest structure in Sweden, reaching 200 meters in height.

The tower under construction in Karlskrona will become the second tallest structure in Sweden, reaching 200 meters in height.

The IE-FLIGHT system enables true zero-emission flight, using evaporative cooling technology to improve thermal efficiency.

These measurements form a unique and valuable dataset, providing essential information for megamodeling studies, extreme weather events and large-scale calibration of numerical models.

The Okeanus A-Frame system has a 20-ton capacity and has been tested on two major projects prior to its official launch.

BGE, Sunrun and Ford announce the launch of the first bi-directional vehicle-to-home charging program that allows electric vehicle owners to use the transport battery to power…

Sierra Space's inflatable space station could comfortably house four astronauts and feature a garden for growing fresh food.

The device can generate up to 5 liters of water per day per kilogram of adsorbent material, using a surface area equivalent to two soccer fields…

This is the first time TCP technology has been used for ultra-deepwater flowlines, according to Strohm.

The Red Star Catcher will enable spacecraft to generate 5 to 10 times more power without modernization.

The LanWin3 connection system will use an offshore and onshore cable of more than 200 km to connect an offshore wind farm to the European mainland.

This machine can produce 500 castings in three eight-hour shifts.

In a major technological breakthrough, Cemvita, a company dedicated and specialized in the processing of sustainable oil from waste, achieved historical records in large industrial biotechnology…