
Energean moves forward with development of Irena gas field
100% of Energean's gas in Irena has already secured a buyer thanks to its long-term agreement with INA.

100% of Energean's gas in Irena has already secured a buyer thanks to its long-term agreement with INA.

This program will validate solutions under real operating conditions and lay the groundwork for future implementations at other Noble assets.

The company was able to identify new untapped geological formations that could change the country's energy projection.

This type of offshore work requires high-precision technical coordination, from the design of the infrastructure to its commissioning.

It will have a mixed feed cracker capable of producing 1.65 million tons of ethylene per year.

The contract multiplies the reach of Weatherford's MPD technology in Mexican deepwater.
The Shenandoah field, along with Shenandoah South and Monument, contains about 600 million barrels of recoverable oil equivalent.

The Saudi oil giant continues to bet big on offshore development, with new contracts to expand the Zuluf field.

The contract covers the onshore and surface infrastructure that will enable the FSRU's final integration into the German energy system.

Mina West will be connected subsea to West Delta Deep Marine's (WDDM) existing infrastructure.

The block currently produces 600 million standard cubic feet of gas per day.

Slagugle was the largest discovery on the Norwegian Continental Shelf in 2020.