
FRV drives 1.8 GW of solar and storage projects in the UK
The 1.8 GW submitted by FRV already has permits and is seeking connection to the UK grid between 2026 and 2029.

The 1.8 GW submitted by FRV already has permits and is seeking connection to the UK grid between 2026 and 2029.

The contract with Q ENERGY consolidates its role as a strategic partner in large-scale renewable developments.

The company filed the plan with the Minnesota Public Utilities Commission, proposing to double the previously approved capacity.

First UK marine facility to adopt recyclable blades on a large scale.

The Lusatia region thus becomes a laboratory of technological innovation where solar energy, wind power, storage and flexible power plants converge.

The BRF Froan will be equipped with 96 flat-plate solar panels to reinforce its zero-emission operation.

The Baltic East wind farm will have the capacity to supply 1.25 million homes.

The initiative was also supported by EEMAXX Innovation during the design and permitting stages, ensuring an agile development aligned with local regulations.

GulfStar reaches a combined capacity of 911 MWdc between solar and batteries in Texas.

The SupraMarine consortium launches a power transmission solution using superconductor technology to connect remote wind farms to the mainland.

When Hornsea 3 becomes operational, the Hornsea area will exceed 5 GW of capacity, making it the largest operational offshore wind cluster in the world.

The acquisition makes Enery the operator of the largest network of active solar power plants in all of Slovakia, with an annual generation of 651 GWh…