
Navantia Unveils First Monopile for East Anglia Three
Monopiles for the East Anglia Three can weigh up to 1,800 tons, which is roughly equivalent to the weight of 1,200 medium-sized cars.

Monopiles for the East Anglia Three can weigh up to 1,800 tons, which is roughly equivalent to the weight of 1,200 medium-sized cars.

The Windanker project will come on line in 2026, and will be equipped with 21 offshore wind turbines.

The Harvard TH Chan School of Public Health warns that pollutants released by fossil fuels.

These contracts will provide emission-free, affordable geothermal energy for approximately 350,000 homes in Southern California.

The farm has signed a 114 MW power purchase agreement with Basin Electric Power Cooperative.

The Almaraz nuclear power plant reached an output of almost 17,000 GWh in 2023, the third best record since the start of its commercial operation in…

Each wind turbine required the installation of five tower sections to reach a height of 125 meters.

The 44 Vestas V236-15.0 MW wind turbines will be installed and operational by 2027, generating green electricity to support industrial decarbonization.

The grant from the Basque Energy Agency complements other funds, totaling 7.05 million euros for the deployment of the device.

The main goal of this research project is to reduce the maintenance costs of floating wind turbines.

The vessel has impressive dimensions: 148 meters in length, 27.2 meters in width and 14.3 meters in draft.

Planning for a major installation of 1,200 solar and wind energy metering stations throughout the country.