Nuh Çimento improves port efficiency with Liebherr LPS 420 electric crane
In the private port of Hereke, Turkey, Nuh Çimento has started operations of a Liebherr LPS 420 electric crane, consolidating its modernization strategy to meet the…
In the private port of Hereke, Turkey, Nuh Çimento has started operations of a Liebherr LPS 420 electric crane, consolidating its modernization strategy to meet the…

Maersk has officially opened its new logistics center in the Lin-gang area of Shanghai, consolidating its commitment to an integrated service network in the Asia-Pacific region.…

The OSS Jasmund marine substation successfully completed the loading of its superstructure and support base, and is now preparing for shipment and installation.

Vard Electro will provide full technical support to six vessels to ensure their continued operation under extreme conditions.

The company is extending its 4D seismic and permanent monitoring services on the Norwegian continental shelf until 2030.

The main function of the CLV is to install high voltage cables connecting offshore wind farms and interconnection systems to regional power grids.

Fugro used two vessels simultaneously to accelerate the surveys and achieve complete coverage of the seabed and cable corridor.

The sandwich tank design strengthens the trend towards functional hulls that prioritize remote inspection and human crew safety in complex marine conditions.

The company completed the shipment of three large-tonnage modules from Vietnam to Canada for an LNG export plant.

500M turbine and foundation installation to be executed through 2030 using Cadeler's specialized fleet at a large-scale offshore wind farm.

CO₂ transfer without hydraulics: Technip installs electric arms on Northern Lights.

A floating laboratory equipped with a swing keel and sensors for data collection of underwater acoustics and currents.