Aker BP moves key module that extends life of Valhall PWP
The installed module weighs 4,800 tons and is key to ensuring safe production at Valhall.
I am a civil engineer and I work in the writing area. I have a deep passion for civil works. I constantly seek to update myself on new engineering technologies to integrate them into my work, since my main interest is exploring how innovations in the industrial sector can improve and transform the world.
The installed module weighs 4,800 tons and is key to ensuring safe production at Valhall.
The Skred well revealed a 14 meter gas column, with high quality sandstone and potential for a subsea connection to Johan Castberg.
Block 59 covers 11,480 km² in ultra-deep water, between 2,700 and 3,500 meters deep.
FERC authorizes Enstor to begin expansion that will double the Mississippi Center's operating capacity by 2028.
SunRise's 2780 m² solar mural generates 265 kW and reduces 150 tons of CO₂ annually.
Dajin combines fish farming and solar energy in a single project that avoids 320,000 tons of CO₂ per year.
The Gjøa Nord, Cerisa and Ofelia discoveries contain up to 110 million barrels of oil equivalent.
Flinders researchers propose a clean, reusable technique to recover gold from e-waste and ores without harming the environment.
The contract covers 4,200 km² and integrates several previously separate blocks, with an investment of US$1.35 billion.
The first 15 MW turbine is already rotating at the Baltic Power marine park, ushering in a new energy era for Poland.
The project plans to store more than 10 million tons of CO₂ per year in a marine salt reservoir 250 km offshore.
The new battery test center performs critical validations such as thermal shock and altitude simulation for strategic sectors.