Seatrium takes contract to build BP’s Tiber FPU in Gulf of Mexico
The Tiber FPU will be installed at a depth of 1,250 meters and will be integrated with a single 30,000-ton lift.
I am a civil engineer and I work in the writing area. I have a deep passion for civil works. I constantly seek to update myself on new engineering technologies to integrate them into my work, since my main interest is exploring how innovations in the industrial sector can improve and transform the world.
The Tiber FPU will be installed at a depth of 1,250 meters and will be integrated with a single 30,000-ton lift.
The warehouse will be fully leased during the construction phase, according to Garbe Industrial's forecasts.
The OFF-5 block reaches depths of up to 4,100 meters, making it one of the most challenging ultra-deepwater projects in South America.
The digital board in Rotterdam makes it possible to process more shipments and shorten the stay of refrigerated containers at the terminals.
Nikkiso will use nitrogen from the new plant at its local factory to test cryogenic pumps.
Sesam software incorporates methods that reduce structural analysis time for floating wind turbines.
The EH216-S reduced a 30-minute city commute by car to just 8 minutes of pilotless flight.
Sizewell C turns nuclear waste into foundations, integrating circular economy, CO₂ reduction and reduced road impact in Suffolk.
The data center will have a capacity of several hundred megawatts, making it one of the largest in Europe.
The collaboration between FairWind and WEP opens up new possibilities in onshore and offshore wind maintenance in the Japanese market.
INPEX is the first company in Japan to demonstrate the entire integrated hydrogen and ammonia chain, from production to local end use.
The system makes it possible to convert existing vehicles without the need to renew entire fleets.