Solstad Maritime secures new contract for the “Normand Pioneer”.
Operations are scheduled to begin in October 2025.
Industrial engineer, entrepreneur and copywriter with several years of experience in the digital world. A fan of reading and creative writing. Isbel has always been fascinated by topics related to the ocean and the mysteries of the universe. She has been part of the Inspenet team as a news editor since 2023.
Operations are scheduled to begin in October 2025.
The plant is able to recover more than 99% of the ionic solvents used, eliminating liquid, gaseous and solid residues.
The Dayton plant is designed to manufacture up to 500 eVTOL electric aircraft per year.
During the event, a special session was held on the use of artificial intelligence and machine learning to predict corrosion rates in oil wells.
AMPP LatinCORR 2025 gathers the world Board in Panama and plans expansion in Latin America.
This is the first time in 83 years that a Latin American has held the position of global president of AMPP.
Experts will discuss strategies adapted to the challenges of corrosion management in critical infrastructures.
The rotor of this offshore wind platform reaches 262 meters in diameter.
This event marks the first time that two major corrosion conferences have come together under one roof.
The first contracts under this agreement are for the Holtwood and Safe Harbor hydroelectric plants.
It will be towed with crew on board, which will allow oil production to start approximately two weeks earlier than usual.
The company expects to capture and store up to 2 million metric tons of CO₂ per year.