TotalEnergies begins first phase of engineering and design studies for LNG development in Papua New Guinea

Inspenet.

Share on social networks

inspenet - 727

By : Franyi Sarmiento, Ph.D., Inspenet, July 25, 2022

TotalEnergies announced the decision of the Papua LNG joint venture to launch the first phase of the initial engineering and design (FEED) studies for the upstream production facilities of the Papua LNG project.

At the same time, studies for downstream liquefaction facilities are progressing according to the project schedule, with the goal of launching the integrated FEED in the fourth quarter of 2022. The project is targeting a final investment decision (FID) around the end of 2023, and commissioning in late 2027.

La Conferencia y Feria Comercial ILTA 2024 inicio
Conferencia y Feria Comercial ILTA 2024
La nueva generacion del robot Phoenix fue presentada
Cientificos prueban tecnologia para refrescar el planeta
Terminal maritima del sur de Brooklyn sera un centro de energia eolica marina
ILTA 2024 Conference and Trade Fair started successfully
Inspenet will be at the ILTA 2024 Conference and Trade Fair
The new generation of the Phoenix robot was presented
Scientists test cloud whitening to “refresh the planet”
South Brooklyn Marine Terminal to Be Center for Offshore Wind Energy
PlayPause
previous arrowprevious arrow
next arrownext arrow
 

“The start of the FEED upstream studies is another significant step towards the development of the Papua LNG project, which will increase Papua New Guinea’s LNG export capacity and thus contribute to its further development,” said Julien Pouget, Vice President Asia Pacific Senior for Exploration and Production and Renewables at TotalEnergies.

“The Papua LNG project is well positioned to contribute to the growth of LNG supply around the world, especially for customers in Asia looking to decarbonize from coal to gas, in line with our strategy to reduce global greenhouse gas emissions. Pouget added.

The Papua LNG joint venture is committed to developing a landmark project in terms of sustainability, biodiversity and low carbon emissions. Specifically, the project will incorporate a carbon capture and storage scheme for the CO 2 native to the fields, which will be reinjected into the reservoirs.

Source : https://petrobanca.com/totalenergies-lanza-estudios-de-ingenieria-y-diseno-para-el-desarrollo-de-gnl-en-papua-nueva-guinea/

Share this news on your social networks

Rate this post
1 star2 stars3 stars4 stars5 stars (No rating yet)
Loading...