Lifting of the M10 module marks a step forward for the Energean Power FPSO

With this advance, an increase of up to 25 thousand barrels per day is projected in 2025.
Share on social networks
FPSO Energean Power

The M10 module of Energean Power’s second oil train is now lifted and in position on the Energean Power FPSO . The operation, executed in collaboration with Israeli authorities and specialized contractors, was carried out following unloading at the port of Limassol and required precise coordination of work teams in the Mediterranean maritime environment.

YouTube video

Moment of the module’s elevation. Source: Energean

The performance of the Energean Power FPSO

This achievement boosts Energean’s capacity in the region to expand liquids production, with a target of 20-25 thousand barrels of oil per day projected for the second half of 2025. The installation and commissioning of this module, estimated to take six months, are crucial to optimise the performance of the Energean Power FPSO and improve the supply of safe and reliable energy.

Energean Power FPSO performance
The expansion of the FPSO is significant. Source: Energean

Energean, a leader in natural gas exploration and production in the Eastern Mediterranean and North Sea, reaffirms its commitment to regional energy security by completing this stage of the project.

This expansion of the FPSO, one of the most significant of its kind in the Mediterranean, strengthens the oil production infrastructure and highlights the company’s ability to operate in synergy with different sectors, boosting both the economy and energy security in the region.

Follow us on social media and don’t miss any of our posts!

YouTube LinkedIn Facebook Instagram X TikTok

Source and photos: Energean

Share this news on your social networks
Rate this post
1 star2 stars3 stars4 stars5 stars (No rating yet)
Post Rating LoaderLoading...