FPSO Petrojarl I production shutdown at Atlanta field

The FPSO Atlanta has the capacity to store 1.6 million barrels of oil, significantly more than Petrojarl I's 180,000 barrels.

Share on social networks

FPSO Petrojarl I

The Brazilian oil and gas company, Enauta, has decided to stop production of the FPSO Petrojarl I to carry out necessary modifications to the equipment, after conducting inspections at the processing plant in the Atlanta field, located offshore Brazil. This measure has been taken to ensure the correct maintenance of the selected equipment.

Enauta resumes production in June

The company has announced that expects to resume production at the Atlanta field in the next few weeks of June . This decision comes after the company completed a five-day maintenance operation on Petrojarl I at the end of May, allowing the temporary resumption of production.

In addition, the Petrojarl I is scheduled to be replaced by the Petrojarl I. FPSO Atlanta a larger-capacity unit, whose mooring operations began in mid-May. Enauta has reported that 19 of the 20 FPSO Atlanta anchors have already been installed and that activities to connect the first two wells to the platform are scheduled to begin after June 15.

Misiones a Marte en riesgo por contraccion renal de astronautas
El simulacro de la NASA para evacuar a un astronauta herido causo alarmas
Youtuber crea Pixelbot 3000 una impresora IA que ensambla piezas de LEGO
The X2 flying car on Beijing
La tecnologia del robot Morphy 2
Mars missions at risk due to astronauts’ kidney contraction
NASA drill to evacuate injured astronaut raised alarms
Youtuber creates Pixelbot 3000: an AI printer that assembles LEGO parts
X2 flying car takes to the skies of Beijing
Meet the autonomous flying “Morphy robot” with morphological awareness
PlayPause
previous arrowprevious arrow
next arrownext arrow
 

Petrojarl I and Atlanta FPSO Capabilities

It is important to note that Petrojarl I has a production capacity of 30,000 barrels of oil per day and a storage capacity of 180,000 barrels, while FPSO Atlanta has the capacity to process 50,000 barrels per day, handle 140,000 barrels of water per day and store 1.6 million barrels of oil.

Finally, Enauta expects first oil production from the Atlanta FPSO to start next August.

Follow us on social networks and don’t miss any of our publications!

YouTube LinkedIn Facebook Instagram X

Source: oedigital

Photo: Enauta

Share this news on your social networks

Rate this post
1 star2 stars3 stars4 stars5 stars (No rating yet)
loading spinnerLoading...