Ocean Installer expands its presence in the Balder Next project
Vår Energi awards key contract to Ocean Installer to advance the subsea development of the Balder field in the North Sea.
Vår Energi awards key contract to Ocean Installer to advance the subsea development of the Balder field in the North Sea.
Kiel University develops new rotor blades with natural fibers such as flax and balsa wood to reduce waste in wind energy.
The Tonlé Sap Lake is losing its vital water pulse due to intensive mining on the Mekong River.
The contract will enable the distribution of liquefied natural gas on a small scale in remote regions of northern Brazil.
The BRF Froan will be equipped with 96 flat-plate solar panels to reinforce its zero-emission operation.
Thanks to more than half a million professionals who build this knowledge network around the world.
GulfStar reaches a combined capacity of 911 MWdc between solar and batteries in Texas.
The SupraMarine consortium launches a power transmission solution using superconductor technology to connect remote wind farms to the mainland.
Both vessels were ordered from the Korean shipyard SHI as part of AET's sustainable fleet expansion plan.
The unit completed its technical reactivation in Europe and begins the journey to join drilling in Vietnam.
OMV Austria achieves its first find in Block 106/4, with initial production in excess of 4,200 barrels per day.
It inspected 68 cables in three days with an accuracy of 92.37 %, reducing risks and maintenance times.