BW Energy Acquires FPSO for Deployment in Brazilian Field
The total oil production capacity of the Polvo FPSO after its refurbishment will be 65,000 barrels per day.
I am a civil engineer and I work in the writing area. I have a deep passion for civil works. I constantly seek to update myself on new engineering technologies to integrate them into my work, since my main interest is exploring how innovations in the industrial sector can improve and transform the world.
The total oil production capacity of the Polvo FPSO after its refurbishment will be 65,000 barrels per day.
In the future, up to 50 million tons of waste material from wind turbine blades could accumulate if sustainable alternatives are not implemented.
Mount Erebus emits 80 grams of gold a day, valued at about $6,000.
The plant has the capacity to treat the wastewater of 12.6 million people, which is equivalent to the population of Mexico City.
The proposed gas pipeline would have an initial daily capacity of 15 million cubic meters.
The hydroelectric plants in question supply 50% of the country's energy.
Authorities recovered the remains of the sixth and final victim of the incident, a 37-year-old man.
The cessation of mine operations significantly impacted the Panamanian economy.
The failure occurred during a hydraulic test that sought to verify the resistance of the pipe.
This new method could reduce the need for phosphorus imports in Japan, by taking advantage of local secondary resources
The Baltic Eagle wind farm will reduce approximately 800,000 tonnes of CO₂ emissions annually.
The Thun Reliance has a cargo tank capacity of 9,540 m³.