SLB & Aker Nab US Carbon Capture Facility Contract
Just Catch 400 modular technology allows the prefabrication of carbon capture units, speeding up the installation and operation process.
Just Catch 400 modular technology allows the prefabrication of carbon capture units, speeding up the installation and operation process.
The large fuel barge will enable strategic transportation of LNG fuel for future Crowley orders.
The PC490HRD-11 excavator can reach heights of up to 104 feet, facilitating demolition work on large structures.
The solar track uses only one third of the water that would be used in a manual cleaning, coming from a pressure washer.
Uniper is the first carrier to utilize BioLNG production capacity at Rotterdam's Gate terminal.
The subsea pump developed is the first of its kind to operate without seals or barrier fluid, using seawater to cool and lubricate its system.
The tower under construction in Karlskrona will become the second tallest structure in Sweden, reaching 200 meters in height.
The new technology will allow drilling from light intervention vessels, which could cut traditional well construction costs by 30%.
Airbus' Racer helicopter, developed as part of the Clean Sky 2 project, has managed to exceed its target cruise speed of 407 km/h(220 knots) within a short period…
This test records the second time Starliner's thrusters have successfully ignited while the spacecraft is docked to the ISS.
The global maritime sector generates 940 million tons of CO₂ per year, 2.5% of global emissions.
The IE-FLIGHT system enables true zero-emission flight, using evaporative cooling technology to improve thermal efficiency.