Electric power in Colombia: The sites with the highest availability and the progress of 15 GW renewables

Inspenet.

Share on social networks

inspenet - 714

By : Franyi Sarmiento, Ph.D., Inspenet, July 20, 2022

The Energy Mining Planning Unit (UPME) held the sixth day of socialization of the new connection request procedure, within the framework of Resolution 075.

There, the entity’s technicians explained that 7,977.33 MW of generation have already been released since the application of this scheme, but that the number could be increased to 8,440 total MW to be released during the normalization stage, plus another 2,249 total MW to be released during the of implementation.

Cientificos prueban tecnologia para refrescar el planeta
Terminal maritima del sur de Brooklyn sera un centro de energia eolica marina
Crean robot monociclo con patas llamado Ringbot
BionicBee abejas robots ultraligeras de vuelo autonomo
Presentan a Astribot S1 un robot humanoide con IA ultra veloz
Scientists test cloud whitening to “refresh the planet”
South Brooklyn Marine Terminal to Be Center for Offshore Wind Energy
They create a unicycle robot with legs called Ringbot
BionicBee: autonomously flying ultralight robot bees
Astribot S1 presented: a humanoid robot with ultra-fast AI
PlayPause
previous arrowprevious arrow
next arrownext arrow
 

In short, once the process is complete, there could be an expected release of some 10,689 MW available to be used by new projects.

On the other hand, Christian Jaramillo Herrera, General Director of UPME, confided that there are 5,712 MW in undertakings with commitments (including exempt 075), and 9,610 MW without commitments, that in both cases their promoters have presented guarantees.

Of the 7,977.33 MW released, the UPME indicated that Santander is the Department with the highest capacity withdrawn: 1,089.7MW. Then, Antioquia follows with 1,026. And Córdoba closes the podium of the Departments that exceed the GW of release, with 1037.3 MW.

The department of César, with 699.8 MW released; and to Bolívar, with 679.8 MW. Meanwhile, La Guajira, as one of the departments with the largest wind and solar resource in Colombia, released 140 MW; but the allocation was one of the largest: 2,240 MW, only surpassed by Antioquia (2,944 MW) and Córdoba (2,606 MW).

According to UPME data, so far capacity has been assigned to projects for 17,705.79MW. This is a good volume considering that the entire electrical matrix of Colombia amounts to 17,806 MW.

Source : https://petrobanca.com/liberaciones-y-asignaciones-los-sitios-con-mayor-avaponibilidad-y-el-avance-de-15-gw-renovables-en-colombia/

Share this news on your social networks

Rate this post
1 star2 stars3 stars4 stars5 stars (No rating yet)
Loading...