{"id":62126,"date":"2022-11-25T11:00:00","date_gmt":"2022-11-25T15:30:00","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/pemex-tenders-construction-of-marine-platform-on-the-coast-of-campeche\/"},"modified":"2022-11-29T13:56:35","modified_gmt":"2022-11-29T18:26:35","slug":"pemex-tenders-construction-of-marine-platform-on-the-coast-of-campeche","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/pemex-tenders-construction-of-marine-platform-on-the-coast-of-campeche\/","title":{"rendered":"Pemex tenders construction of marine platform on the coast of Campeche"},"content":{"rendered":"\n<p><strong>By<\/strong> : Inspenet, Nov 25, 2022<\/p>\n\n<p>Pemex Exploration and Production (PEP), presented the call for the contracting via bidding for the engineering, procurement and construction of a marine platform to be installed in the Campeche Sound, Gulf of Mexico.<\/p>\n\n<p>The company is looking for a supplier to build the &#8220;PI-Ayatsil-F&#8221; platform to be installed in the Ayatsil field. According to the bidding rules, the contractor must carry out the basic and detailed engineering, procurement, construction, testing, transportation, installation, interconnection, and commissioning of the project.<\/p>\n\n<p>The state productive company reported that the contest will be carried out under the &#8220;Pemex Electronic Procurement System&#8221; (SISCeP).<\/p>\n\n<p>Only persons of Mexican nationality or from countries with which the United Mexican States have entered into a Free Trade Agreement with Provisions regarding Public Sector Procurement and the goods to be acquired, whether of national origin or originating from the partner countries may participate. treated.<\/p>\n\n<p><strong>Source<\/strong> : <a href=\"https:\/\/oilandgasmagazine.com.mx\/2022\/11\/pemex-licita-construccion-de-plataforma-marina\/\" target=\"_blank\" rel=\"noopener\">https:\/\/oilandgasmagazine.com.mx\/2022\/11\/pemex-licita-construccion-de-plataforma-marina\/<\/a><\/p>\n\n<p><strong>Photo<\/strong> : Shutterstock<\/p>\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"#shorts Pemex licita construcci\u00f3n de plataforma marina en la costa de Campeche \ud83c\udf0a\" width=\"422\" height=\"750\" src=\"https:\/\/www.youtube.com\/embed\/n25E6pJAYcI?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n<p>Don&#8217;t miss the <strong>Inspenet News<\/strong> at: <a href=\"https:\/\/inspenet.com\/en\/inspenet-tv\/\">https:\/\/inspenet.com\/inspenet-tv\/<\/a><\/p>\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Pemex licita construcci\u00f3n de plataforma marina en la costa de Campeche \ud83c\udf0a\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/O4cckoHEDfc?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>By: Inspenet, November 25, 2022.<br \/>\nPemex Exploration and Production (PEP), presented the call for the contracting via bidding for the engineering, procurement and construction of a marine platform to be installed in the Campeche Sound, Gulf of Mexico.<\/p>\n","protected":false},"author":7047,"featured_media":62034,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13048],"etiqueta_noticias":[],"class_list":["post-62126","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-maritime"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/62126","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/7047"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=62126"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/62126\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/62034"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=62126"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=62126"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=62126"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}