{"id":343927,"date":"2026-03-16T22:57:18","date_gmt":"2026-03-17T02:57:18","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/woodfibre-lng-installs-the-core-component-of-its-liquefaction-module\/"},"modified":"2026-03-17T08:22:45","modified_gmt":"2026-03-17T12:22:45","slug":"woodfibre-lng-installs-the-core-component-of-its-liquefaction-module","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/woodfibre-lng-installs-the-core-component-of-its-liquefaction-module\/","title":{"rendered":"Woodfibre LNG installs the core component of its liquefaction module"},"content":{"rendered":"\n<p>After months of technical preparation, the <strong>Woodfibre LNG<\/strong> plant has received the liquefaction module, a structure weighing over 10,000 metric tons, which arrived at the industrial site aboard the <strong>vessel Red Zed 1<\/strong>.<\/p>\n\n<p>This component represents the fifteenth element of a total of nineteen that will form the final infrastructure. The equipment&#8217;s size is comparable to a professional football field, and its arrival marks the beginning of the final onshore assembly phase. <\/p>\n\n<h2 class=\"wp-block-heading\">Electric Propulsion Technology and the Liquefaction Module<\/h2>\n\n<p>Unlike plants that rely on combustion turbines, this module integrates state-of-the-art <strong><a href=\"\/en\/news\/nextchem-and-siemens-energy-seek-to-electrify-the-maritime-industry-with-methanol\/\" data-type=\"noticias\" data-id=\"302876\" target=\"_blank\" rel=\"noreferrer noopener\">Siemens<\/a> electric motors<\/strong>. Furthermore, the direct connection to <strong>BC Hydro&#8217;s<\/strong> renewable grid will allow the natural gas cooling process to -162 \u00b0C to occur without generating direct operational emissions. <\/p>\n\n<p>This technical configuration positions the Canadian project as an international benchmark in greenhouse gas management for future environmentally conscious energy projects.<\/p>\n\n<p>CEO Luke Schauerte emphasized that this system is the operational core that will transform <em>British Columbia&#8217;s<\/em> resource into a high-energy-density fuel. It is essential to mention that this development is overseen by the <strong>Squamish Nation<\/strong>, acting as a full environmental authority. <\/p>\n\n<p>The integration of capital from <strong>Pacific Energy Corporation<\/strong> and <strong>Enbridge<\/strong> supports a vision where economic profitability and climate responsibility converge. With the goal of completing construction in 2027, the industry is closely observing this model of responsible export. <\/p>\n\n<p><strong>Source and photo: <a href=\"https:\/\/woodfibrelng.ca\/news\/2026\/03\/11\/woodfibre-lng-brings-facilitys-heart-onshore-as-new-module-arrives\/\" target=\"_blank\" rel=\"noreferrer noopener\">Woodfibre LNG<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The arrival of the 10,847-metric-ton module initiates the electric liquefaction phase, powered by BC Hydro&#8217;s renewable energy.<\/p>\n","protected":false},"author":8404,"featured_media":343916,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13036],"etiqueta_noticias":[],"class_list":["post-343927","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-oil-and-gas"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/343927","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=343927"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/343927\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/343916"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=343927"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=343927"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=343927"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}