{"id":343152,"date":"2026-03-12T21:57:20","date_gmt":"2026-03-13T01:57:20","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/slb-onesubsea-secures-contract-with-pttep-for-kikeh-3b-project-in-malaysia\/"},"modified":"2026-03-13T08:21:02","modified_gmt":"2026-03-13T12:21:02","slug":"slb-onesubsea-secures-contract-with-pttep-for-kikeh-3b-project-in-malaysia","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/slb-onesubsea-secures-contract-with-pttep-for-kikeh-3b-project-in-malaysia\/","title":{"rendered":"SLB OneSubsea secures contract with PTTEP for Kikeh 3B project in Malaysia"},"content":{"rendered":"\n<p>Companies <strong>SLB OneSubsea<\/strong> and <strong>PTTEP Sabah Oil Limited<\/strong> announce an alliance for the execution of engineering, procurement, and construction services to strengthen the infrastructure of the <strong>Kikeh 3B project<\/strong>. This announcement confirms the delivery of integrated subsea production systems that will boost extraction in one of the region&#8217;s most dynamic areas. <\/p>\n\n<h2 class=\"wp-block-heading\">The expansion of the Kikeh 3B project in the Sabah basin<\/h2>\n\n<p>Under the terms of the agreement, the joint venture will provide essential equipment, including three subsea trees and a high-precision manifold. Additionally, the technology package includes distribution units and integrated control systems that ensure operability in complex environments. The <strong>technical deployment<\/strong> is scheduled for the operational phases of 2026 and 2027, firmly relying on the manufacturing capabilities the group maintains active in Malaysian territory.  <\/p>\n\n<p>Mads Hjelmeland, the organization&#8217;s CEO, has stated that this award represents a crucial stage for the region&#8217;s energy resources. The collaboration with <strong><a href=\"https:\/\/inspenet.com\/en\/news\/pttep-sarawak-oil-approves-fid-for-sk405b-project-in-malaysia\/\" data-type=\"post\" data-id=\"336805\">PTTEP<\/a><\/strong> has spanned over two decades, enabling efficient execution across the three recently signed projects. The <strong>Kikeh field<\/strong> stands out as the precursor to the country&#8217;s deepwater activities, maintaining its relevance since operations began almost twenty years ago.  <\/p>\n\n<p>The current intervention aims to optimize production in water depths ranging from 1,300 to 1,400 meters. The integration of these high-value subsea systems ensures that the local industry continues to advance in safety and technical efficiency standards. <\/p>\n\n<p><strong>Source and photo: <a href=\"https:\/\/www.onesubsea.slb.com\/resources\/news\/2026\/slb-onesubsea-secures-contract-for-deepwater-project-offshore-malaysia\" target=\"_blank\" rel=\"noreferrer noopener\">SLB OneSubsea<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>PTTEP awards SLB OneSubsea contract for integrated systems supply for Kikeh 3B subsea development off the coast of Malaysia.<\/p>\n","protected":false},"author":8404,"featured_media":343109,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13048],"etiqueta_noticias":[],"class_list":["post-343152","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-maritime"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/343152","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=343152"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/343152\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/343109"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=343152"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=343152"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=343152"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}