{"id":342096,"date":"2026-03-08T22:30:00","date_gmt":"2026-03-09T02:30:00","guid":{"rendered":"https:\/\/inspenet.com\/?p=342096"},"modified":"2026-03-06T12:18:03","modified_gmt":"2026-03-06T16:18:03","slug":"lamprell-to-carry-out-subsea-pipeline-replacement-for-ongc","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/lamprell-to-carry-out-subsea-pipeline-replacement-for-ongc\/","title":{"rendered":"Lamprell to carry out subsea pipeline replacement for ONGC"},"content":{"rendered":"\n<p>International EPCI services company Lamprell has been officially appointed by India\u2019s state-owned ONGC to execute the ambitious PRP-IX Pipeline Replacement Project, which involves replacing 285 kilometers of <strong><a href=\"https:\/\/inspenet.com\/en\/articulo\/in-service-structural-underwater-inspection\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/articulo\/inspeccion-submarina-en-servicio-estructuras\/\" rel=\"noreferrer noopener\">subsea pipelines<\/a><\/strong> in the Mumbai High, Neelam-Heera, and Bassein &amp; Satellite offshore fields.<\/p>\n\n<p>This contract reaffirms Lamprell\u2019s presence as a strategic supplier in Asia\u2019s offshore market, consolidating its expertise in engineering, procurement, construction, transportation, and installation (EPCI) for major <strong><a href=\"https:\/\/inspenet.com\/en\/news\/iron-sodium-batteries-to-power-data-centers-in-switzerland\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/noticias\/inlyte-nts-impulsan-baterias-de-hierro-sodio\/\" rel=\"noreferrer noopener\">energy projects<\/a><\/strong>. The project scope also includes modifications to existing offshore platforms, increasing the technical complexity of the assignment. <\/p>\n\n<h2 class=\"wp-block-heading\">Strengthening the relationship with ONGC<\/h2>\n\n<p><em>&#8220;We are honored by this award,&#8221; <\/em>said Ian Prescott, Lamprell\u2019s CEO.<em>. &#8220;PRP-IX tests our integrated capabilities and strengthens our collaboration with ONGC to modernize India\u2019s offshore energy infrastructure.&#8221;<\/em><\/p>\n\n<p>With operational headquarters in the UAE and a strategic presence in India and Saudi Arabia, Lamprell continues to strengthen its profile as a key partner for the <strong><a href=\"https:\/\/inspenet.com\/en\/brief\/seventh-edition\/the-energy-transition\/\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/brief\/septima-edicion\/la-transicion-energetica\/\" target=\"_blank\" rel=\"noreferrer noopener\">energy transition<\/a><\/strong> in critical regions of the hydrocarbons sector.<\/p>\n\n<h2 class=\"wp-block-heading\">Subsea pipelines and a boost to offshore infrastructure<\/h2>\n\n<p>This agreement represents a firm step toward renewing India\u2019s offshore energy infrastructure and positions Lamprell as a leading player in the integrated offshore solutions market.<\/p>\n\n<p><strong>Source: <a href=\"https:\/\/www.lamprell.com\/2026\/03\/05\/lamprell-appointed-for-ongcs-pipeline-replacement-project-prp-ix\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.lamprell.com\/2026\/03\/05\/lamprell-appointed-for-ongcs-pipeline-replacement-project-prp-ix\/\" rel=\"noreferrer noopener\">Lamprell<\/a><\/strong><\/p>\n\n<p><strong>Photo: Shutterstock<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The PRP-IX project calls for the replacement of 285 km of subsea pipelines in key fields off India\u2019s west coast.<\/p>\n","protected":false},"author":9014,"featured_media":342065,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13048],"etiqueta_noticias":[],"class_list":["post-342096","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-maritime"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/342096","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/9014"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=342096"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/342096\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/342065"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=342096"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=342096"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=342096"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}