{"id":342094,"date":"2026-03-08T08:17:00","date_gmt":"2026-03-08T12:17:00","guid":{"rendered":"https:\/\/inspenet.com\/?p=342094"},"modified":"2026-03-08T08:17:36","modified_gmt":"2026-03-08T12:17:36","slug":"enel-colombia-and-isa-energia-launch-the-atlantico-solar-park","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/enel-colombia-and-isa-energia-launch-the-atlantico-solar-park\/","title":{"rendered":"Enel Colombia and ISA ENERG\u00cdA launch the Atl\u00e1ntico solar park"},"content":{"rendered":"\n<p>In the heart of Atl\u00e1ntico, between Sabanalarga and Usiacur\u00ed, the Atl\u00e1ntico solar park is now operating, a <strong><a href=\"https:\/\/inspenet.com\/en\/news\/origis-completes-500-mwdc-solar-project-in-texas\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/noticias\/origis-completa-planta-solar-swift-air-texas\/\" rel=\"noreferrer noopener\">photovoltaic plant<\/a><\/strong> with a capacity of 180 megawatts of alternating current. This project, led by Enel Colombia, is already supplying clean energy to the National Interconnected System. <\/p>\n\n<p>For its part, ISA ENERG\u00cdA was responsible for building the connection infrastructure that enables its integration into the system. This work included a 3.5-kilometer transmission line, 500 meters of which are underground, thus providing a technical solution that optimizes land use and respects the dynamics of the environment. <\/p>\n\n<h2 class=\"wp-block-heading\">Atl\u00e1ntico solar park and energy transition underway<\/h2>\n\n<p>The plant features over 403,000 <strong><a href=\"https:\/\/inspenet.com\/en\/news\/worlds-largest-solar-plant-based-on-circular-economy-opens-in-genk\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/noticias\/instalan-planta-solar-paneles-reciclables\/\" rel=\"noreferrer noopener\">solar panels<\/a><\/strong> distributed across 34 sub-fields and is projected to generate approximately 525 gigawatt-hours per year. This renewable energy will strengthen the country&#8217;s energy matrix and benefit millions of users. <\/p>\n\n<p>The project is part of a broader solar complex that also includes <strong><a href=\"https:\/\/www.enelgreenpower.com\/es\/proyectos\/operativos\/parque-fotovoltaico-guayepo-1-2\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.enelgreenpower.com\/es\/proyectos\/operativos\/parque-fotovoltaico-guayepo-1-2\" rel=\"noreferrer noopener\">Guayepo I, II<\/a><\/strong> and III, consolidating Atl\u00e1ntico as a benchmark in installed solar generation capacity in Colombia. The complex exceeds 730 MWac, positioning it as one of the most significant in Latin America. <\/p>\n\n<h2 class=\"wp-block-heading\">Efficient Infrastructure and Innovation in Transmission<\/h2>\n\n<p>The underground transmission solution implemented by ISA ENERG\u00cdA stands out as a relevant technical contribution. This type of infrastructure not only improves aesthetics and land utilization but also increases operational safety and facilitates maintenance. <\/p>\n\n<p>With this advancement, Colombia moves closer to the national goal of reaching 6 GW of solar generation defined in the governmental plan. Additionally, it contributes to fulfilling environmental commitments and building a <strong><a href=\"https:\/\/inspenet.com\/en\/news\/first-4-hour-battery-energy-storage-system-in-operation-in-the-netherlands\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/noticias\/compania-en-marcha-sistema-bess-de-4-horas\/\" rel=\"noreferrer noopener\">more resilient and sustainable electrical system<\/a><\/strong>. <\/p>\n\n<h2 class=\"wp-block-heading\">Regional Development Driven by Clean Energy<\/h2>\n\n<p>Beyond its energy contribution, the construction of the <strong><a href=\"https:\/\/www.enel.com.co\/es\/energias-renovables-egp\/proyecto-solar-atlantico.html\" data-type=\"link\" data-id=\"https:\/\/www.enel.com.co\/es\/energias-renovables-egp\/proyecto-solar-atlantico.html\" target=\"_blank\" rel=\"noopener\">Atl\u00e1ntico so<\/a><a href=\"https:\/\/www.enel.com.co\/es\/energias-renovables-egp\/proyecto-solar-atlantico.html\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.enel.com.co\/es\/energias-renovables-egp\/proyecto-solar-atlantico.html\" rel=\"noreferrer noopener\">l<\/a><a href=\"https:\/\/www.enel.com.co\/es\/energias-renovables-egp\/proyecto-solar-atlantico.html\" data-type=\"link\" data-id=\"https:\/\/www.enel.com.co\/es\/energias-renovables-egp\/proyecto-solar-atlantico.html\" target=\"_blank\" rel=\"noopener\">ar park<\/a><\/strong> and its associated infrastructure generated employment and opportunities for local communities. It is estimated that over 70% of the workers involved were people from the region, reinforcing thus the connection between sustainability and development social. <\/p>\n\n<p>The start of operations of the Atl\u00e1ntico solar park marks a new advance in the country&#8217;s energy transition, in an alliance between key players in the electricity sector committed to a cleaner, safer, and more efficient future.<\/p>\n\n<p><strong>Source and photo: <a href=\"https:\/\/www.facebook.com\/ISAEnegiaCo\/posts\/en-isa-energ%C3%ADa-celebramos-que-el-parque-solar-atl%C3%A1ntico-de-enel-ya-est%C3%A1-generand\/1239422235072002\/\" data-type=\"link\" data-id=\"https:\/\/www.facebook.com\/ISAEnegiaCo\/posts\/en-isa-energ%C3%ADa-celebramos-que-el-parque-solar-atl%C3%A1ntico-de-enel-ya-est%C3%A1-generand\/1239422235072002\/\" target=\"_blank\" rel=\"noreferrer noopener\">ISA ENERG\u00cdA<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A 500 kV underground line connects the new 180 MW solar park to the national electrical grid from Atl\u00e1ntico.<\/p>\n","protected":false},"author":9014,"featured_media":342044,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-342094","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/342094","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/9014"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=342094"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/342094\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/342044"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=342094"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=342094"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=342094"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}