{"id":323444,"date":"2025-12-15T16:44:39","date_gmt":"2025-12-15T20:44:39","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/bp-boosts-gulf-of-mexico-production-with-atlantis-drill-center-1\/"},"modified":"2025-12-16T08:42:43","modified_gmt":"2025-12-16T12:42:43","slug":"bp-boosts-gulf-of-mexico-production-with-atlantis-drill-center-1","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/bp-boosts-gulf-of-mexico-production-with-atlantis-drill-center-1\/","title":{"rendered":"BP boosts Gulf of Mexico production with Atlantis Drill Center 1"},"content":{"rendered":"\n<p>Energy company BP <strong>has commissioned Atlantis Drill Center 1<\/strong>, a key development located in the Gulf of Mexico. <strong><a href=\"https:\/\/inspenet.com\/en\/news\/bp-confirms-new-oil-discovery-in-the-gulf-of-mexico\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/noticias\/bp-descubre-petroleo-en-el-golfo-de-mexico\/\" rel=\"noreferrer noopener\">Gulf of Mexico<\/a><\/strong>. This new center connects two subsea wells to the Atlantis platform via a tieback system, allowing up to 15,000 barrels of oil equivalent per day (boe\/d) to be added to gross production capacity. The project came onstream two months ahead of schedule, cementing BP&#8217;s fifth project of the year ahead of schedule.  <\/p>\n\n<h2 class=\"wp-block-heading\">Atlantis Drill Center 1 leverages existing infrastructure<\/h2>\n\n<p>The <strong><a href=\"https:\/\/www.linkedin.com\/posts\/bp_another-milestone-in-the-gulf-of-america-activity-7404846622033211392-6kU0?utm_source=share&amp;utm_medium=member_desktop&amp;rcm=ACoAAEKYikgBjygh5GpRtttit6tTS7TQvMcSdSs\" data-type=\"link\" data-id=\"https:\/\/www.linkedin.com\/posts\/bp_another-milestone-in-the-gulf-of-america-activity-7404846622033211392-6kU0?utm_source=share&amp;utm_medium=member_desktop&amp;rcm=ACoAAEKYikgBjygh5GpRtttit6tTS7TQvMcSdSs\" rel=\"nofollow noopener\" target=\"_blank\">Atlantis Drill Center 1 expansion<\/a><\/strong> benefits from the offshore infrastructure already deployed in the region. By connecting wells to the current operating system, BP has reduced execution times and costs. Atlantis, <strong>one of BP&#8217;s deepest platforms<\/strong>, is anchored at depths of more than 2,100 meters and has an installed capacity of up to 200,000 barrels per day.  <\/p>\n\n<p>This project is the second in BP&#8217;s portfolio of new initiatives planned for the Gulf of Mexico by 2030. It joins the <g id=\"gid_0\"><g id=\"gid_1\">Argos Southwest<\/g><\/g>extension, which began in August, and the future expansion of the main Atlantis facility, scheduled for 2027. The company&#8217;s goal is to reach a total production of more than 400,000 boe\/d in this region.  <\/p>\n\n<h2 class=\"wp-block-heading\">Earlier production, lower costs<\/h2>\n\n<p>The early completion of Atlantis Drill Center 1 was made possible by optimized planning, use of preexisting subsea inventory and efficient offshore execution. Gordon Birrell, Executive Vice President, Production and Operations, noted that these achievements reflect BP&#8217;s ability to generate sustainable value at lower costs. <\/p>\n\n<p>BP operates Atlantis with a 56% interest, while Woodside Energy holds the remaining 44%. In total, BP operates five <strong><a href=\"https:\/\/inspenet.com\/en\/articulo\/smart-automated-offshore-oil-platforms\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/articulo\/plataformas-petroleras-inteligentes-offshore\/\" rel=\"noreferrer noopener\">platforms in the Gulf of Mexico<\/a><\/strong> and participates in four other non-operated centers, consolidating its position as a major player in U.S. deepwater production. <\/p>\n\n<p><strong>Source and photo: <a href=\"https:\/\/www.bp.com\/en\/global\/corporate\/news-and-insights\/press-releases\/bp-starts-up-seventh-major-project-of-2025.html\" data-type=\"link\" data-id=\"https:\/\/www.bp.com\/en\/global\/corporate\/news-and-insights\/press-releases\/bp-starts-up-seventh-major-project-of-2025.html\" target=\"_blank\" rel=\"noopener\">bp<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>BP connects two new subsea wells to the Atlantis platform and anticipates production in the Gulf of Mexico.<\/p>\n","protected":false},"author":9014,"featured_media":323323,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13036],"etiqueta_noticias":[],"class_list":["post-323444","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-oil-and-gas"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/323444","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/9014"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=323444"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/323444\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/323323"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=323444"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=323444"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=323444"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}