{"id":318467,"date":"2025-12-01T13:48:18","date_gmt":"2025-12-01T17:48:18","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/ocp-green-energy-puts-202-mwp-of-solar-power-plants-into-operation\/"},"modified":"2025-12-01T16:39:10","modified_gmt":"2025-12-01T20:39:10","slug":"ocp-green-energy-puts-202-mwp-of-solar-power-plants-into-operation","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/ocp-green-energy-puts-202-mwp-of-solar-power-plants-into-operation\/","title":{"rendered":"OCP Green Energy puts 202 MWp of solar power plants into operation"},"content":{"rendered":"\n<p>OCP Green Energy, a subsidiary of the OCP Group, has activated the first phase of its energy investment program with the entry into operation of 3 solar plants totaling <strong>202 megawatt peak (MWp)<\/strong>. They are located in <strong>Benguerir (67 MWp), Foum Tizi (30 MWp) and Oulad Far\u00e8s (105 MWp)<\/strong>, the latter considered the <strong>largest photovoltaic plant in operation in Morocco<\/strong>. <\/p>\n\n<p>The new plants are already supplying electricity to several mining operations. <strong><a href=\"https:\/\/inspenet.com\/en\/articulo\/best-practices-for-the-future-of-mining\/#toc_heading-5\" target=\"_blank\" rel=\"noreferrer noopener\">mining and industrial operations<\/a><\/strong> and industrial operations, including the production of customized fertilizers.<\/p>\n\n<h2 class=\"wp-block-heading\">Clean energy for mines and fertilizers<\/h2>\n\n<p>The electricity generated covers a substantial part of the energy consumption in <strong>OCP&#8217;s mines and factories<\/strong>, allowing it to stabilize costs and make progress on its environmental commitments. The estimated cost of <strong><a href=\"https:\/\/inspenet.com\/en\/articulo\/operational-efficiency-renewable-energies\/\" target=\"_blank\" rel=\"noreferrer noopener\">electricity production<\/a><\/strong> is around <strong>368 MAD\/MWh<\/strong>, a competitive figure. <\/p>\n\n<p>In addition to supplying the mines, energy is also directed to infrastructure such as desalination plants operated by <strong>OCP Green Water<\/strong> and strategic business units such as <strong>SBU Manufacturing<\/strong> and <strong>SPS (Specialized Products and Solutions).<\/strong><\/p>\n\n<h2 class=\"wp-block-heading\">First LFP battery system in Morocco<\/h2>\n\n<p>In parallel, OCP Green Energy has started the execution of the first phase of its battery energy storage system (BESS). <strong><a href=\"https:\/\/inspenet.com\/en\/news\/sonnedix-japan-launches-first-battery-energy-storage-system-in-oita\/\" target=\"_blank\" rel=\"noreferrer noopener\">battery energy storage system (BESS)<\/a><\/strong>which will have a capacity of <strong>25 MW\/125 MWh<\/strong> and an autonomy of 5 hours by 2026. It will enable the storage of <strong><a href=\"https:\/\/inspenet.com\/en\/news\/companies-to-replace-coal-with-solar-power-to-produce-critical-minerals-in-california\/\" target=\"_blank\" rel=\"noreferrer noopener\">solar energy<\/a><\/strong> during the day to be <strong>used during peak demand hours<\/strong>, reducing intermittency and improving grid stability. <\/p>\n\n<h2 class=\"wp-block-heading\">Institutional support and international financing<\/h2>\n\n<p>The development of these infrastructures was authorized by the <strong>Ministry of Energy Transition and Sustainable Development<\/strong>, and complies with the current legal framework for self-production, under the supervision of <strong>ANRE<\/strong>. The connection agreements signed with <strong>ONEE<\/strong> allow the transmission of electricity generated to different industrial centers of the group. <\/p>\n\n<p>The project received a financial boost with the injection of <strong>100 million euros<\/strong> from the International Finance Corporation (IFC), backed by the World Bank Group. In addition to this investment, the <strong>German KfW<\/strong> and contributions from the <strong>Clean Technology Fund (CTF)<\/strong>, in collaboration with the African Development Bank, are specifically supporting the development of the storage system. <\/p>\n\n<h2 class=\"wp-block-heading\">On course for 1.2 GW in 2027<\/h2>\n\n<p>With the first phase already in operation, OCP Green Energy reaffirms its goal of reaching <strong>1.2 GW of renewable capacity by 2027<\/strong> and exceeding <strong>2 GW in the following years<\/strong>, including more than 2 GWh of storage capacity.<\/p>\n\n<p>This development is part of the <strong>OCP Group&#8217;s energy transition strategy<\/strong>, which aims to cover 100 % of its industrial electricity needs with <strong><a href=\"https:\/\/inspenet.com\/en\/articulo\/renewable-energy-sources\/\" target=\"_blank\" rel=\"noreferrer noopener\">renewable sources<\/a><\/strong> sources by 2027 and to achieve <strong>carbon neutrality by 2040<\/strong>.<\/p>\n\n<p><strong>Source: <a href=\"https:\/\/www.ocpgroup.ma\/press-release-article\/ocp-green-energy-commissions-first-phase-its-investment-program-202-mwp-solar\" target=\"_blank\" rel=\"noreferrer noopener\">OCP Group<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The farms supply clean energy to OCP Group&#8217;s mines and plants in order to become energy independent.<\/p>\n","protected":false},"author":10019,"featured_media":318267,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-318467","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/318467","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/10019"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=318467"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/318467\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/318267"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=318467"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=318467"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=318467"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}