{"id":314054,"date":"2025-11-20T10:52:37","date_gmt":"2025-11-20T14:52:37","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/nexans-electra-vessel-builds-ulstein-verft-port-for-offshore-projects-in-norway\/"},"modified":"2025-11-20T11:05:05","modified_gmt":"2025-11-20T15:05:05","slug":"nexans-electra-vessel-builds-ulstein-verft-port-for-offshore-projects-in-norway","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/nexans-electra-vessel-builds-ulstein-verft-port-for-offshore-projects-in-norway\/","title":{"rendered":"Nexans Electra vessel builds Ulstein Verft port for offshore projects in Norway"},"content":{"rendered":"\n<p>The recent launch of the <strong>Nexans Electra <\/strong>at the <strong>Ulstein Verft shipyard<\/strong> represents a tangible step forward in global electrification plans. This new CLV<em>(Cable Laying Vessel<\/em>) enters the final phase of its construction, with advanced equipment aimed at strengthening the subsea power infrastructure. <\/p>\n\n<h2 class=\"wp-block-heading\">The technical preparation of the Nexans Electra<\/h2>\n\n<p>The berthing of the Nexans Electra in Ulstein Verft&#8217;s roofed facilities allowed for precise assembly work under protected weather conditions. This stage included the installation of the main generators, deck machinery and essential electrical systems. <\/p>\n\n<p>With the capacity to lay up to <strong><strong><a href=\"https:\/\/inspenet.com\/en\/news\/maersk-and-mdl-finalize-installation-of-dynamic-elevators-in-brazil\/\">four simultaneous submarine cables<\/a><\/strong><\/strong> and a total load of 13,500 tons distributed on three turntables, the Nexans Electra is ready to operate in complex marine environments. In addition, its main function will be to install high-voltage cables connecting offshore wind farms and interconnection systems to regional power grids. <\/p>\n\n<p>This vessel is part of <strong>Nexans&#8217; strategy <\/strong>as a global provider of renewable energy solutions. Its operational deployment will also be essential for subsea electrification projects, enhancing the ability to interconnect renewable energy sources on a large scale. <\/p>\n\n<p>The <em>Ulstein Verft shipyard<\/em>, with a long history in specialized shipbuilding, provides modern facilities and skilled labor. Moreover, its indoor working methodology improves the quality of completion and optimizes the long-term performance of the vessel. <\/p>\n\n<p>The next phase involves the completion of assembly and final system adjustments, including sea trials scheduled for spring 2026. The <strong>Nexans Electra<\/strong> will be ready to be integrated into offshore operations, playing a strategic role in the expansion of sustainable power grids. <\/p>\n\n<p><strong>Source and photo: <a href=\"https:\/\/ulstein.com\/news\/launching-the-clv-nexans-electra-at-ulstein-verft\" target=\"_blank\" rel=\"noreferrer noopener\">Ulstein<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The main function of the CLV is to install high voltage cables connecting offshore wind farms and interconnection systems to regional power grids.<\/p>\n","protected":false},"author":8404,"featured_media":314049,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13048],"etiqueta_noticias":[],"class_list":["post-314054","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-maritime"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/314054","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=314054"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/314054\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/314049"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=314054"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=314054"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=314054"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}