{"id":311090,"date":"2025-12-22T15:32:00","date_gmt":"2025-12-22T19:32:00","guid":{"rendered":"https:\/\/inspenet.com\/?p=311090"},"modified":"2025-12-09T15:45:00","modified_gmt":"2025-12-09T19:45:00","slug":"yeu-noirmoutier-offshore-wind-farm","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/yeu-noirmoutier-offshore-wind-farm\/","title":{"rendered":"Yeu-Noirmoutier offshore wind farm in France moves forward"},"content":{"rendered":"\n<p>The <strong>Yeu-Noirmoutier offshore wind farm<\/strong> project continues to consolidate its development on the French Atlantic coast, making significant progress both offshore and onshore. This renewable energy <strong><a href=\"https:\/\/inspenet.com\/en\/articulo\/operational-efficiency-renewable-energies\/\" target=\"_blank\" rel=\"noreferrer noopener\">renewable energy<\/a><\/strong> represents one of the largest offshore infrastructure deployments in France. <\/p>\n\n<p>In mid-June, the DEME Group successfully completed the installation of the foundations for the wind turbines, using the specialized vessel Innovation <strong><a href=\"https:\/\/www.deme-group.com\/technologies\/innovation\" target=\"_blank\" rel=\"noreferrer noopener\">specialized vessel <em>Innovation<\/em><\/a><\/strong>. This operation was carried out in three phases: drilling of the seabed, placement of <strong><a href=\"https:\/\/inspenet.com\/en\/news\/first-xxl-monopiles-of-the-inch-cape-offshore-wind-farm-are-unveiled\/\" data-type=\"post\" data-id=\"267047\" target=\"_blank\" rel=\"noreferrer noopener\">monopiles<\/a><\/strong> and assembly of transition pieces. <\/p>\n\n<p>These structures serve as the base for wind generators, designed to withstand the harsh ocean conditions.<\/p>\n\n<p>At the same time, the laying of <strong><a href=\"https:\/\/inspenet.com\/en\/news\/submarine-cable-repair-ship\/\" data-type=\"post\" data-id=\"163246\" target=\"_blank\" rel=\"noreferrer noopener\">submarine cables<\/a><\/strong> continues apace. Since March 1, Louis Dreyfus TravOcean has installed more than 90 kilometers of cabling, connecting the turbines to each other. <\/p>\n\n<p>On June 22, the 61st cable was completed, marking an important advance in the electrical interconnection of the park.<\/p>\n\n<p>Currently, 36 <strong><a href=\"https:\/\/inspenet.com\/en\/articulo\/advances-high-performance-wind-turbines\/\">wind turbines<\/a> <\/strong>are already in operation, supplying offshore wind power to the national grid.<\/p>\n\n<h2 class=\"wp-block-heading\">Collaborative effort for offshore wind farm<\/h2>\n\n<p>The Yeu-Noirmoutier offshore wind farm is being developed with the participation of several companies, scientific organizations and associations. The <a href=\"https:\/\/renews.biz\/84964\/yeu-and-noirmoutier-reaches-fid\/\" target=\"_blank\" rel=\"noopener\"><strong>GIS EMYN<\/strong><\/a>a research network promoted by EMYN, brings together universities, scientific centers and private companies. <\/p>\n\n<p>Its objective is to study the environmental impact of the installation of the offshore wind farm and share technical knowledge with the community.<\/p>\n\n<p>Source and photo: <strong><a href=\"https:\/\/iles-yeu-noirmoutier.eoliennes-mer.fr\/2025\/09\/17\/les-travaux-du-parc-emyn-avancent-a-grand-pas\/\" target=\"_blank\" rel=\"noopener\">Eoliennes en mer Dieppe-Le-Tr\u00e9port (EMDT)<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>More than 90 kilometers of cabling have been installed.<\/p>\n","protected":false},"author":8059,"featured_media":310693,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-311090","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/311090","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8059"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=311090"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/311090\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/310693"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=311090"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=311090"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=311090"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}