{"id":308508,"date":"2025-10-21T21:30:45","date_gmt":"2025-10-22T01:30:45","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/atlas-renewable-energy-secures-financing-for-solar-storage-project-in-chile\/"},"modified":"2025-10-22T08:37:50","modified_gmt":"2025-10-22T12:37:50","slug":"atlas-renewable-energy-secures-financing-for-solar-storage-project-in-chile","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/atlas-renewable-energy-secures-financing-for-solar-storage-project-in-chile\/","title":{"rendered":"Atlas Renewable Energy secures financing for solar storage project in Chile"},"content":{"rendered":"\n<p><strong>Atlas Renewable Energy <\/strong>confirmed the closing of a US$475 million financing structure to develop the<strong> Copiap\u00f3 Solar system<\/strong>, an initiative that will combine photovoltaic generation with battery storage in the Atacama Region. This project seeks to supply renewable electricity to the operations of<strong> Grupo CAP<\/strong>, one of the largest players in the mining and steel industry in Chile. <\/p>\n\n<h2 class=\"wp-block-heading\">The solar storage project for the Chilean mining industry<\/h2>\n\n<p>Through long-term power purchase agreements<em>(PPAs<\/em>), Atlas will provide up to 450 GWh of sustainable energy annually to CAP subsidiaries such as <strong>Compa\u00f1\u00eda Minera del Pac\u00edfico ( <\/strong><em>CMP<\/em>) and <strong>Aguas CAP<\/strong>. The electricity obtained will supply their operations in the Atacama and Coquimbo regions with an emission-free source. <\/p>\n\n<p>The Copiap\u00f3 Solar development will have an installed solar capacity of 357 MWp and a <strong>BESS storage system <\/strong>of 320 MW to operate for four hours. The estimated annual generation is 750 GWh, establishing the project as one of the most relevant in the country in renewable energy with storage. <\/p>\n\n<p>This financial support was structured with the participation of institutions such as <strong>BBVA<\/strong>, <strong>BCI<\/strong>, <strong>CACIB<\/strong>, <strong>Natixis CIB<\/strong>, <strong>SMBC <\/strong>and <strong>Soci\u00e9t\u00e9 G\u00e9n\u00e9rale<\/strong>, reflecting international confidence in the Chilean clean energy model.<\/p>\n\n<p>Atlas will include mechanisms that will allow scaling the system in the future and commercializing part of the energy through its Acierta business unit, aimed at independent customers. This flexible approach consolidates <em>Copiap\u00f3 Solar<\/em> as a replicable model for high-consumption industries by guaranteeing continuous supply through the integration of <a href=\"https:\/\/inspenet.com\/en\/articulo\/new-technologies-in-industrial-automation\/\" target=\"_blank\" data-type=\"articulo\" data-id=\"205561\" rel=\"noreferrer noopener\"><strong><strong>renewable technologies<\/strong><\/strong><\/a>. <\/p>\n\n<p>With this new step, Atlas exceeds US$1.2 billion in projects financed in the country in the last 13 months. This is in addition to the development of other systems, such as the <strong><a href=\"https:\/\/inspenet.com\/en\/news\/atlas-renewable-energy-secures-us510-million-for-solar-and-storage-project-in-chile\/\" data-type=\"post\" data-id=\"249459\">Estepa project<\/a><\/strong> project and the<strong> Desert BESS plant<\/strong>. <\/p>\n\n<p><strong>Source and photo: <a href=\"https:\/\/www.atlasrenewableenergy.com\/atlas-renewable-energy-closes-us475m-financing-for-solar-storage-project-to-supply-clean-energy-to-the-mining-sector\" target=\"_blank\" rel=\"noreferrer noopener\">Atlas Renewable Energy<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Atlas&#8217; flexible vision consolidates the Copiap\u00f3 Solar project as a replicable model for high consumption industries.<\/p>\n","protected":false},"author":8404,"featured_media":308483,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-308508","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/308508","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=308508"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/308508\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/308483"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=308508"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=308508"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=308508"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}