{"id":308148,"date":"2025-10-25T09:00:00","date_gmt":"2025-10-25T13:00:00","guid":{"rendered":"https:\/\/inspenet.com\/?p=308148"},"modified":"2025-10-20T16:25:25","modified_gmt":"2025-10-20T20:25:25","slug":"naturgy-battery-storage-for-spain","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/naturgy-battery-storage-for-spain\/","title":{"rendered":"Naturgy battery storage for Spain"},"content":{"rendered":"\n<p>Naturgy, one of Spain&#8217;s leading energy companies, has begun construction of its <strong>first large-scale battery storage projects in Spain<\/strong>. The new facilities will be hybridized with <strong><a href=\"https:\/\/inspenet.com\/en\/news\/china-inaugurates-worlds-tallest-solar-photovoltaic-plant-in-tibet\/\" target=\"_blank\" rel=\"noreferrer noopener\">solar photovoltaic plants<\/a><\/strong> and will be deployed in four autonomous communities, including <strong>Almeria, Las Palmas and Pontevedra<\/strong>.   <\/p>\n\n<p>The main objective is to <strong>store the excess energy<\/strong> produced by its solar plants and will add a total capacity of 160 MW and a storage capacity of 342 MWh to the national electricity system. This initiative is part of a total portfolio of <strong>10 projects that will be operational by 2026<\/strong>. <\/p>\n\n<h2 class=\"wp-block-heading\">European investment for a real energy transition<\/h2>\n\n<p>The development of these projects has been financed by the European Union through the <strong>NextGenerationEU program<\/strong>, within the framework of the <strong><a href=\"https:\/\/inspenet.com\/en\/?p=308147\" target=\"_blank\" rel=\"noreferrer noopener\">Recovery, Transformation and Resilience Plan.<\/a><\/strong>. The total investment exceeds <strong>80 million euros<\/strong>. <\/p>\n\n<p>The annual storage capacity will reach <strong>125,000 MWh<\/strong>, enough to cover the electricity consumption of more than 38,000 households. In addition, nine of the projects will be hybridized with solar installations and one will be independent, connected directly to the grid in Vigo. <\/p>\n\n<h2 class=\"wp-block-heading\">A strategic step towards the PNIEC objectives<\/h2>\n\n<p>The battery storage <strong><a href=\"https:\/\/inspenet.com\/en\/news\/energy-vault-to-operate-large-battery-system-in-australia-after-winning-contract\/\" target=\"_blank\" rel=\"noreferrer noopener\">battery storage projects<\/a><\/strong> projects are in line with the National Integrated Energy and Climate Plan (PNIEC), which establishes that <strong>81% of electricity generation must come from renewable sources<\/strong> by <strong>2030<\/strong>. To achieve this goal, the Spanish government plans to incorporate 22.5 GW of storage capacity into the system. <\/p>\n\n<h2 class=\"wp-block-heading\">Towards a more robust and sustainable electricity system<\/h2>\n\n<p>Although these are the first projects in Spain, Naturgy has already demonstrated its technical capacity in battery storage outside the country, such as in Australia, where <strong>it successfully connected its first large-scale battery installation<\/strong>, or the start-up of Cunderdin, <strong>Naturgy&#8217;s first major hybrid project worldwide<\/strong>. Both experiences provide guarantees for the deployment in Spain. <\/p>\n\n<p>This announcement is an <strong>excellent sign for the Spanish energy system<\/strong>, as it shows that concrete steps are being taken with real investment to solve the intermittency of renewable energies. <strong><a href=\"https:\/\/inspenet.com\/en\/articulo\/operational-efficiency-renewable-energies\/\" target=\"_blank\" rel=\"noreferrer noopener\">renewable energies<\/a><\/strong><\/p>\n\n<p><strong>Source: <a href=\"https:\/\/www.naturgy.com\/notas-de-prensa\/naturgy-inicia-la-construccion-de-sus-primeros-proyectos-de-almacenamiento-con-baterias-en-espana\/\" target=\"_blank\" rel=\"noreferrer noopener\">Naturgy<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The new facilities will strengthen the national electricity supply and accelerate the integration of renewable energies.<\/p>\n","protected":false},"author":10019,"featured_media":308118,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-308148","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/308148","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/10019"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=308148"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/308148\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/308118"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=308148"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=308148"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=308148"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}