{"id":304916,"date":"2025-10-07T14:38:58","date_gmt":"2025-10-07T18:38:58","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/penultimate-refueling-of-almaraz-nuclear-power-plant-begins\/"},"modified":"2025-10-08T10:08:35","modified_gmt":"2025-10-08T14:08:35","slug":"penultimate-refueling-of-almaraz-nuclear-power-plant-begins","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/penultimate-refueling-of-almaraz-nuclear-power-plant-begins\/","title":{"rendered":"Penultimate refueling of Almaraz Nuclear Power Plant begins"},"content":{"rendered":"\n<p>The Almaraz Nuclear Power Plant started the <strong>penultimate refueling of its Unit 2<\/strong> in the early morning of October 5th, exactly at 23:59 hours, an operation foreseen in the shutdown schedule that will culminate on October 31st, 2028. This technical shutdown, the 29th, will last approximately 33 days. <\/p>\n\n<h2 class=\"wp-block-heading\">Fewer hires due to imminent closure<\/h2>\n\n<p>On this occasion, <strong>an additional workforce of 1,000 workers<\/strong> has been incorporated, 200 less than in previous cycles. This reduction responds to the fact that improvements will no longer be made in the long term, resulting in a negative and progressive effect on <strong>local employment in Campo Ara\u00f1uelo<\/strong>, with an estimated loss of <strong>4,000 direct and indirect jobs<\/strong> at the end of the operation of both units. <\/p>\n\n<p>During this refueling, <strong>60 fuel assemblies<\/strong> will be replaced, the maintenance of the low pressure turbine number 2 will be carried out, the seals of the core cooling pumps will be checked and different preventive tasks will be performed on the safety systems. Everything will be carried out in accordance with the operating standards required by the <strong>Nuclear Safety Council (CSN)<\/strong>. <\/p>\n\n<h2 class=\"wp-block-heading\">Unit 1: last recharge in 2026<\/h2>\n\n<p>On the other hand, <strong>Unit 1 of the <a href=\"https:\/\/www.foronuclear.org\/descubre-la-energia-nuclear\/energia-nuclear-en-espana\/central-nuclear-de-almaraz-ii\/\" target=\"_blank\" rel=\"noreferrer noopener\">Almaraz Nuclear Power Plant<\/a><\/strong> is also in the final stretch of its life cycle. According to the current operating permit, its closure date is November 1, 2027, so its <strong>last refueling<\/strong> is scheduled to begin in March 2026. <\/p>\n\n<p>The company that owns and is responsible for the management, operation and maintenance of the plant, <strong>Centrales Nucleares Almaraz-Trillo (CNAT)<\/strong>, will submit before the end of this month the documentation for the cessation licensing to the CSN.<\/p>\n\n<figure class=\"wp-block-image aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/cdn.inspenet.com\/central-nuclear-almaraz-vista-aerea-1024x576.webp\" alt=\"Penultimate refueling for Almaraz Nuclear Power Plant\" class=\"wp-image-304647\" srcset=\"https:\/\/cdn.inspenet.com\/central-nuclear-almaraz-vista-aerea-1024x576.webp 1024w, https:\/\/cdn.inspenet.com\/central-nuclear-almaraz-vista-aerea-300x169.webp 300w, https:\/\/cdn.inspenet.com\/central-nuclear-almaraz-vista-aerea-768x432.webp 768w, https:\/\/cdn.inspenet.com\/central-nuclear-almaraz-vista-aerea-1536x864.webp 1536w, https:\/\/cdn.inspenet.com\/central-nuclear-almaraz-vista-aerea-624x351.webp 624w, https:\/\/cdn.inspenet.com\/central-nuclear-almaraz-vista-aerea.webp 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Representative view of a nuclear power plant with cooling towers. Source: Almaraz-Trillo Nuclear Power Plants <\/figcaption><\/figure>\n\n<h2 class=\"wp-block-heading\">Closure questioned due to its impact and taxation<\/h2>\n\n<p>The sector warns that <strong>the taxation applied to <a href=\"https:\/\/inspenet.com\/en\/news\/decommissioning-of-nuclear-power-plants\/\" target=\"_blank\" rel=\"noreferrer noopener\">nuclear power plants in Spain<\/a><\/strong>, according to independent reports, is unique in the world and makes the continuity of these facilities unfeasible. In fact, it is pointed out that without a change in taxation, <strong>the owner companies (Iberdrola, Endesa and Naturgy)<\/strong> will not be able to extend the useful life of their plants. <\/p>\n\n<p>Likewise, experts in the nuclear field and voices of the <strong>\n  <a href=\"https:\/\/inspenet.com\/en\/news\/nuclear-forum-closing-of-nuclear-plants\/\" target=\"_blank\" rel=\"noreferrer noopener\">Nuclear Forum<\/a>\n<\/strong> have denounced that while countries such as the United States are extending the life of their reactors <strong>to 80 years<\/strong> or building new facilities, <strong>Spain is moving in the opposite direction<\/strong>, increasing its dependence on gas and other fossil fuels in an uncertain energy context.<\/p>\n\n<h2 class=\"wp-block-heading\">Commitment to the last megawatt<\/h2>\n\n<p>Despite the closure context, <strong>CNAT<\/strong> has reiterated its commitment to the safe, reliable and efficient operation of the plant. According to the entity, the objective is to <strong>produce energy up to the last megawatt hour<\/strong>, complying with all safety standards and without disrupting the national power supply. <\/p>\n\n<p><strong>Source: <a href=\"https:\/\/www.cnat.es\/noticias.php\" target=\"_blank\" rel=\"noreferrer noopener\">Almaraz-Trillo Nuclear Power Plants.<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The plant has started the process with fewer workers and tasks limited by the closure schedule.<\/p>\n","protected":false},"author":10019,"featured_media":304640,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-304916","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/304916","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/10019"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=304916"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/304916\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/304640"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=304916"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=304916"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=304916"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}