{"id":299364,"date":"2025-09-18T16:22:12","date_gmt":"2025-09-18T20:22:12","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/longroad-energy-closes-financing-for-1000-mile-solar-project-in-texas\/"},"modified":"2025-09-18T16:57:29","modified_gmt":"2025-09-18T20:57:29","slug":"longroad-energy-closes-financing-for-1000-mile-solar-project-in-texas","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/longroad-energy-closes-financing-for-1000-mile-solar-project-in-texas\/","title":{"rendered":"Longroad Energy closes financing for 1000 Mile Solar project in Texas"},"content":{"rendered":"\n<p>U.S. developer <strong>Longroad Energy<\/strong> has confirmed the financial close of its <strong>1000 Mile Solar project<\/strong>, a 400 MWdc<em>(300 MWac<\/em>) facility under construction in Yoakum County, Texas. The energy produced will be fed into the grid. <strong><a href=\"https:\/\/inspenet.com\/en\/news\/longroad-energy-and-meta-boost-solar-project-in-texas\/\" target=\"_blank\" data-type=\"post\" data-id=\"218023\" rel=\"noreferrer noopener\">Southwest Power Pool<\/a><\/strong><em>(SPP<\/em>) and will support Meta&#8217;s commitment to operate with 100% clean electricity. <\/p>\n\n<h2 class=\"wp-block-heading\">The financing of the 1000 Mile Solar project<\/h2>\n\n<p>The financial agreement includes a contract with <strong><a href=\"https:\/\/inspenet.com\/en\/news\/longroad-energy-and-meta-boost-solar-project-in-texas\/\" target=\"_blank\" rel=\"noreferrer noopener\">contract with Meta<\/a><\/strong> for the purchase of long-term environmental attributes, which will enable the technology company to power its data centers with renewable electricity. This commitment is part of Meta&#8217;s goal to decarbonize its operations throughout the United States. <\/p>\n\n<p>This project has secured fiscal capital through an agreement with <strong>Morgan Stanley Renewables<\/strong>, marking the first collaboration between the two companies. The debt financing was led by <strong>Soci\u00e9t\u00e9 G\u00e9n\u00e9rale<\/strong> and <strong>CIBC<\/strong>, with support from <strong>ANZ<\/strong>, <strong>Barclays <\/strong>and <strong>Key Bank<\/strong>. These funds will enable the technical and operational execution of the project, considered one of Longroad&#8217;s most important.  <\/p>\n\n<p>The 1000 Mile development is Longroad&#8217;s fifth solar installation in Texas, all of them equipped with <strong>First Solar<\/strong>&#8216;s photovoltaic technology. This time, U.S.-made Series 7 modules will be used, a decision that strengthens the focus on local and sustainable energy solutions. Construction, by <strong>SOLV Energy<\/strong>, will generate more than 400 jobs at its peak.  <\/p>\n\n<p>According to <strong>EPA <\/strong>and <strong>REsurety<\/strong> data, the project is estimated to reduce regional emissions by about 475,000 metric tons of CO\u2082 equivalent per year, 20% more efficient than comparable solar projects in other regions of the country. In addition, tax revenues in excess of $18 million are projected for local jurisdictions over the life of the solar farm. <\/p>\n\n<p>Longroad Energy, together with <strong>Northstar Energy Management<\/strong>, will assume operation and maintenance of the plant once it enters commercial operation, expected in 2026. Intelligent tracking equipment will be provided by Nextracker, incorporating 75-degree stowage technology to optimize solar collection. <\/p>\n\n<p>1000 Mile represents a new development in Longroad&#8217;s U.S. project portfolio, which now totals 2.1 GW of capacity in Texas and more than 6 GW nationwide.<\/p>\n\n<p><strong>Source and photo: <a href=\"https:\/\/www.longroadenergy.com\/longroad-energy-achieves-financial-close-of-1000-mile-solar-a-400-mwdc-project\/\" target=\"_blank\" rel=\"noreferrer noopener\">Longroad Energy<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>This 1000 Mile development is Longroad&#8217;s fifth solar installation in Texas.<\/p>\n","protected":false},"author":8404,"featured_media":299263,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-299364","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/299364","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=299364"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/299364\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/299263"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=299364"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=299364"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=299364"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}