{"id":296280,"date":"2025-09-08T10:30:52","date_gmt":"2025-09-08T14:30:52","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/vestas-takes-control-of-goleniow-wind-blade-plant\/"},"modified":"2025-09-08T11:10:12","modified_gmt":"2025-09-08T15:10:12","slug":"vestas-takes-control-of-goleniow-wind-blade-plant","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/vestas-takes-control-of-goleniow-wind-blade-plant\/","title":{"rendered":"Vestas takes control of Goleni\u00f3w wind blade plant"},"content":{"rendered":"\n<p>With the official closing of the agreement signed in May, Vestas has consolidated its industrial presence in Europe by <strong>taking control of the <a href=\"https:\/\/inspenet.com\/en\/news\/china-biggest-wind-turbine-blades\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/noticias\/china-palas-de-turbina-eolica-mas-grandes\/\" rel=\"noreferrer noopener\">onshore wind blade manufacturing<\/a> plant in Goleni\u00f3w<\/strong>, Poland. This facility, previously managed by LM Wind Power, represents a strategic link in the Danish company&#8217;s supply chain. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Wind blade factory and European supply chain<\/h2>\n\n\n\n<p>The Goleni\u00f3w plant, which <strong>became operational in 2009 and was expanded in 2017<\/strong>, will continue to produce blades for onshore turbines, including the EnVentus V172-7.2 MW. This step enables Vestas to enhance its capacity to meet the growing European demand for <strong><a href=\"https:\/\/inspenet.com\/en\/articulo\/operational-efficiency-renewable-energies\/\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/articulo\/eficiencia-operativa-de-energias-renovables\/\" target=\"_blank\" rel=\"noreferrer noopener\">sustainable energy solutions<\/a><\/strong>, said Felix Henseler, the firm&#8217;s chief technology and operations officer.<\/p>\n\n\n\n<p>With the integration of approximately 400 employees from LM Wind Power, Vestas&#8217; total workforce in Poland now stands at around 2,000 people. This move reinforces the company&#8217;s commitment to industrial development and employment generation in the Polish market. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Synergies with offshore production<\/h2>\n\n\n\n<p>The Goleni\u00f3w operation complements the assembly plant that Vestas already operates in Szczecin, where hubs and nacelles for its offshore wind turbine are manufactured <strong><a href=\"https:\/\/www.vestas.com\/en\/energy-solutions\/offshore-wind-turbines\/V236-15MW\" data-type=\"link\" data-id=\"https:\/\/www.vestas.com\/en\/energy-solutions\/offshore-wind-turbines\/V236-15MW\" target=\"_blank\" rel=\"noreferrer noopener\">V236-15.0 MW<\/a><\/strong>. This combination of onshore and offshore capabilities strengthens the company&#8217;s position in major European markets.<\/p>\n\n\n\n<p>The acquisition of this plant represents a consistent step in Vestas&#8217; strategy to expand its manufacturing infrastructure within the continent. By securing local production and keeping talent in the region, the company underscores its confidence in Poland&#8217;s potential to drive the transition to cleaner, more affordable energy. <\/p>\n\n\n\n<p><strong>Source: <a href=\"https:\/\/www.vestas.com\/en\/media\/company-news\/2025\/vestas-officially-takes-over-goleniow-onshore-blade-fac-c4230139\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.vestas.com\/en\/media\/company-news\/2025\/vestas-officially-takes-over-goleniow-onshore-blade-fac-c4230139\" rel=\"noreferrer noopener\">Vestas<\/a><\/strong><\/p>\n\n\n\n<p><strong>Photo: Courtesy of Vestas Wind Systems A\/S<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The integration of 400 workers brings the total number of Vestas employees in Poland to almost 2,000.<\/p>\n","protected":false},"author":9014,"featured_media":296268,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-296280","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/296280","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/9014"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=296280"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/296280\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/296268"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=296280"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=296280"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=296280"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}