{"id":290697,"date":"2025-08-19T15:56:22","date_gmt":"2025-08-19T19:56:22","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/progress-on-the-offshore-wind-farm-on-iles-dyeu-and-noirmoutier\/"},"modified":"2025-08-21T15:13:41","modified_gmt":"2025-08-21T19:13:41","slug":"progress-on-the-offshore-wind-farm-on-iles-dyeu-and-noirmoutier","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/progress-on-the-offshore-wind-farm-on-iles-dyeu-and-noirmoutier\/","title":{"rendered":"Progress on the offshore wind farm on \u00celes d&#8217;Yeu and Noirmoutier"},"content":{"rendered":"\n<p>The offshore wind farm off the French Atlantic coast continues to make progress. Half of the 61 turbines planned for the \u00celes d&#8217;Yeu and Noirmoutier project, a 488-megawatt plant developed by Ocean Winds in collaboration with institutional and private partners, have already been installed. <\/p>\n\n<h2 class=\"wp-block-heading\">An offshore wind farm already generating power<\/h2>\n\n<p>Since June, the site has been injecting clean energy <strong><a href=\"https:\/\/inspenet.com\/en\/news\/verne-powers-clean-on-site-energy-with-hydrogen\/\" data-type=\"post\" data-id=\"260957\" target=\"_blank\" rel=\"noreferrer noopener\">clean energy<\/a><\/strong> into the French electricity system. At half of its operational capacity, it <strong>already provides enough renewable electricity to supply some 400,000 people<\/strong>, about half the population of the Vend\u00e9e department. <\/p>\n\n<p>The wind turbines, of 8 MW each, were manufactured by Siemens Gamesa. Their installation is being carried out by the &#8220;<strong><a href=\"https:\/\/www.jandenul.com\/sites\/default\/files\/public\/Vole%20au%20vent.pdf\" rel=\"nofollow noopener\" target=\"_blank\">Vole au Vent<\/a><\/strong>&#8220;of the Jan De Nul Group. Various local entities, subcontractors and port authorities in western France are joining in this effort. The turbine assembly is scheduled to be completed by September.   <\/p>\n\n<p>It is important to mention that the company is also leading other projects in the country, such as <strong><a href=\"https:\/\/www.oceanwinds.com\/projects\/dieppe-le-treport\/\" target=\"_blank\" rel=\"noreferrer noopener\">Dieppe Le Tr\u00e9port<\/a><\/strong> and the <strong><a href=\"https:\/\/www.oceanwinds.com\/projects\/efgl\/\" target=\"_blank\" rel=\"noreferrer noopener\">EFGL floating farm<\/a><\/strong>floating farm, as well as having secured an additional 250 MW concession in the Mediterranean.<\/p>\n\n<p>The final commissioning of the \u00celes d&#8217;Yeu and Noirmoutier <strong><a href=\"https:\/\/iles-yeu-noirmoutier.eoliennes-mer.fr\/\" target=\"_blank\" rel=\"noreferrer noopener\">\u00celes d&#8217;Yeu and Noirmoutier<\/a><\/strong> is scheduled for the end of 2025, making a significant contribution to France&#8217;s climate and energy objectives.<\/p>\n\n<p><strong>Source: <a href=\"https:\/\/www.linkedin.com\/posts\/ow-ocean-winds_construction-offshorewind-proudtobeow-activity-7363188994299297792-nDMO?utm_source=share&amp;utm_medium=member_desktop&amp;rcm=ACoAABwDBTAB4GohX6ZtDU9YmG5cMdgez-p4kwY\" rel=\"nofollow noopener\" target=\"_blank\">Ocean Winds<\/a><\/strong><\/p>\n\n<p><strong>Photo: shutterstock<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The farm is already generating renewable electricity and is on track for full operation by the end of 2025.<\/p>\n","protected":false},"author":8403,"featured_media":290194,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-290697","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/290697","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8403"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=290697"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/290697\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/290194"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=290697"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=290697"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=290697"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}