{"id":284247,"date":"2025-08-03T13:45:00","date_gmt":"2025-08-03T17:45:00","guid":{"rendered":"https:\/\/inspenet.com\/?p=284247"},"modified":"2025-08-01T16:30:37","modified_gmt":"2025-08-01T20:30:37","slug":"sempra-infrastructure-and-jera-sign-20-year-lng-agreement-from-texas","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/sempra-infrastructure-and-jera-sign-20-year-lng-agreement-from-texas\/","title":{"rendered":"Sempra Infrastructure and JERA sign 20-year LNG agreement from Texas"},"content":{"rendered":"\n<p>Sempra Infrastructure has entered into a sales and purchase agreement with JERA Co. <strong><a href=\"https:\/\/inspenet.com\/en\/articulo\/liquefied-natural-gas-in-latin-america\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/articulo\/gas-natural-licuado-en-america-latina\/\" rel=\"noreferrer noopener\">liquefied natural gas (LNG)<\/a><\/strong> (LNG)<strong> for 1.5 million tons per year for two decades<\/strong>. The agreement involves exports from the Port Arthur LNG Phase 2 project, located in Jefferson County, Texas, on a free-on-board basis. <\/p>\n\n<h2 class=\"wp-block-heading\">Firm LNG supply from Port Arthur Phase 2<\/h2>\n\n<p>The <strong><a href=\"https:\/\/www.jera.co.jp\/en\/news\/information\/20250801_2226\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.jera.co.jp\/en\/news\/information\/20250801_2226\" rel=\"noreferrer noopener\">collaboration between the two companies<\/a><\/strong> companies underscores the mutual commitment to the stability of the energy supply <strong><a href=\"https:\/\/inspenet.com\/en\/news\/companies-to-replace-coal-with-solar-power-to-produce-critical-minerals-in-california\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/noticias\/sv-minerals-adoptara-energia-solar\/\" rel=\"noreferrer noopener\">energy supply<\/a><\/strong> and the transition to a low-carbon model. This contract replaces the preliminary memorandum signed in June 2025 and aligns with JERA&#8217;s strategy to secure reliable LNG volumes in a changing global market. <\/p>\n\n<p>Port Arthur LNG Phase 2 already has major permits in place, including <strong>FERC approval in 2023<\/strong> and U.S. Department <strong>of<\/strong> Energy approval in 2023. <strong><a href=\"https:\/\/www.energy.gov\/articles\/doe-issues-lng-export-authorization-port-arthur-phase-ii-advancing-president-trumps\" data-type=\"link\" data-id=\"https:\/\/www.energy.gov\/articles\/doe-issues-lng-export-authorization-port-arthur-phase-ii-advancing-president-trumps\" target=\"_blank\" rel=\"noreferrer noopener\">U.S. Department of Energy authorization to export to non-NAFTA countries.<\/a><\/strong> to export to non-NAFTA countries. In addition, Bechtel has been awarded the engineering and construction contract, a key element to move towards the final investment decision. <\/p>\n\n<figure class=\"wp-block-image aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/cdn.inspenet.com\/Representantes-de-Sempra-y-JERA-1024x576.webp\" alt=\"Sempra and JERA\" class=\"wp-image-284161\" style=\"width:660px;height:auto\" srcset=\"https:\/\/cdn.inspenet.com\/Representantes-de-Sempra-y-JERA-1024x576.webp 1024w, https:\/\/cdn.inspenet.com\/Representantes-de-Sempra-y-JERA-300x169.webp 300w, https:\/\/cdn.inspenet.com\/Representantes-de-Sempra-y-JERA-768x432.webp 768w, https:\/\/cdn.inspenet.com\/Representantes-de-Sempra-y-JERA-1536x864.webp 1536w, https:\/\/cdn.inspenet.com\/Representantes-de-Sempra-y-JERA-624x351.webp 624w, https:\/\/cdn.inspenet.com\/Representantes-de-Sempra-y-JERA.webp 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Sempra Infrastructure and JERA representatives Source: JERA <\/figcaption><\/figure>\n\n<p>The <strong><a href=\"https:\/\/portarthurlng.com\/expansion\/\" rel=\"nofollow noopener\" target=\"_blank\">Port Arthur LNG Phase 2<\/a><\/strong> includes two <strong><a href=\"https:\/\/inspenet.com\/en\/news\/gas-pipeline-from-gnl-de-cheniere-in-texas\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/noticias\/gasoducto-de-gnl-de-cheniere-en-texas\/\" rel=\"noreferrer noopener\">liquefaction trains<\/a><\/strong> which could <strong>raise the total capacity of the complex to 26 Mtpa<\/strong>, adding to the capacity already developed in Phase 1, scheduled to enter commercial operation between 2027 and 2028.<\/p>\n\n<p><strong>Source: <a href=\"https:\/\/www.sempra.com\/newsroom\/press-releases\/sempra-infrastructure-and-jera-announce-sale-and-purchase-agreement-us-lng\" data-type=\"link\" data-id=\"https:\/\/www.sempra.com\/newsroom\/press-releases\/sempra-infrastructure-and-jera-announce-sale-and-purchase-agreement-us-lng\" target=\"_blank\" rel=\"noreferrer noopener\">Sempra<\/a><\/strong><\/p>\n\n<p><strong>Photos: Port Arthur LNG Phase 2 |<\/strong> <strong>JERA<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The contract ensures the shipment of 1.5 million tons of LNG per year for 20 years from the U.S. to Asia.<\/p>\n","protected":false},"author":9014,"featured_media":284130,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-284247","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/284247","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/9014"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=284247"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/284247\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/284130"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=284247"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=284247"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=284247"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}