{"id":278987,"date":"2025-07-18T09:28:00","date_gmt":"2025-07-18T13:28:00","guid":{"rendered":"https:\/\/inspenet.com\/?p=278987"},"modified":"2025-07-17T16:39:22","modified_gmt":"2025-07-17T20:39:22","slug":"cenovus-completes-key-installation-on-west-white-rose-project","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/cenovus-completes-key-installation-on-west-white-rose-project\/","title":{"rendered":"Cenovus completes key installation on West White Rose project"},"content":{"rendered":"\n<p>Cenovus Energy&#8217;s West White Rose project reached a decisive step with the placement of the upper structure on the concrete gravity base off the coast of Newfoundland and Labrador.<\/p>\n\n<p>Specifically, after a voyage that began on June 3 from the Kiewit shipyard in Texas, the 23,000-ton top structure was transported by the vessel <strong><a href=\"https:\/\/inspenet.com\/en\/news\/deck-from-offshore-platform-is-removed\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/noticias\/extraen-cubierta-de-una-plataforma-maritima\/\" rel=\"noreferrer noopener\">Pioneering Spirit<\/a><\/strong> and positioned in the West White Rose sector of the White Rose oil field on July 16. Thanks to favorable sea conditions, <strong>the assembly process was completed in just two hours<\/strong>. <\/p>\n\n<h2 class=\"wp-block-heading\">West White Rose ready for final connection in Newfoundland<\/h2>\n\n<p>On the other hand, the upper structure integrates key modules such as <strong><a href=\"https:\/\/www.kiewit.com\/projects\/west-white-rose-wellhead-platform\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.kiewit.com\/projects\/west-white-rose-wellhead-platform\/\" rel=\"noreferrer noopener\">144-person accommodations, service block, service<\/a><\/strong>service block, <strong><a href=\"https:\/\/inspenet.com\/en\/news\/skyryse-optimizes-helicopter-takeoff-at-the-push-of-a-button\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/noticias\/skyryse-optimiza-el-despegue-de-helicopteros\/\" rel=\"noreferrer noopener\">heliport<\/a><\/strong>lifeboat stations and drilling substructures. This facility is a key component in the expansion of the field, which includes satellite areas such as North Amethyst, South White Rose and West White Rose. <\/p>\n\n<p>Now, Cenovus Energy&#8217;s efforts are focused on the final tasks: the connection of the subsea infrastructure and the commissioning of the platform, with the expectation of achieving the first <strong><a href=\"https:\/\/inspenet.com\/en\/news\/perenco-acquires-oil-and-gas-production-assets-in-trinidad-and-tobago\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/noticias\/activos-de-produccion-de-petroleo-y-gas\/\" rel=\"noreferrer noopener\">oil production<\/a><\/strong> in the second quarter of 2026. Projections are for peak production in 2028. <\/p>\n\n<p>It should be recalled that the White Rose field, operated and majority owned by Cenovus,  <strong>is located 350 kilometers east of St. John&#8217;s. <\/strong>  and is a key piece of Canada&#8217;s offshore energy portfolio. The original development utilized <strong><a href=\"https:\/\/inspenet.com\/en\/articulo\/technological-models-subsea-exploration\/\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/inspenet.com\/articulo\/modelos-tecnologicos-exploracion-submarina\/\" rel=\"noreferrer noopener\">subsea technology<\/a><\/strong> technology connected to the <strong><a href=\"https:\/\/www.cenovus.com\/Our-operations\/Offshore\/West-White-Rose-project\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.cenovus.com\/Our-operations\/Offshore\/West-White-Rose-project\" rel=\"noreferrer noopener\">SeaRose<\/a><\/strong>FPSO, while this expansion will leverage a fixed platform to exploit approximately 115 million additional barrels. <\/p>\n\n<p><strong>Follow us on social networks and don&#8217;t miss any of our publications!<\/strong><\/p>\n\n<p><a href=\"https:\/\/www.youtube.com\/@inspenet\" rel=\"nofollow noopener\" target=\"_blank\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" rel=\"nofollow noopener\" target=\"_blank\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" rel=\"nofollow noopener\" target=\"_blank\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" rel=\"nofollow noopener\" target=\"_blank\">Instagram<\/a> <a href=\"https:\/\/x.com\/Inspenetnetwork\" rel=\"nofollow\">X (Twitter)<\/a> <a href=\"https:\/\/www.tiktok.com\/@inspenet?_t=8qqIL6dRGNR&amp;_r=1\" rel=\"nofollow noopener\" target=\"_blank\">TikTok<\/a><\/p>\n\n<p><strong>Source and photo: <a href=\"https:\/\/www.linkedin.com\/posts\/cenovus-energy_together-at-last-its-a-first-for-offshore-activity-7351311810555228163-DjRD?utm_source=share&amp;utm_medium=member_desktop&amp;rcm=ACoAAEKYikgBjygh5GpRtttit6tTS7TQvMcSdSs\" target=\"_blank\" data-type=\"link\" data-id=\"https:\/\/www.linkedin.com\/posts\/cenovus-energy_together-at-last-its-a-first-for-offshore-activity-7351311810555228163-DjRD?utm_source=share&amp;utm_medium=member_desktop&amp;rcm=ACoAAEKYikgBjygh5GpRtttit6tTS7TQvMcSdSs\" rel=\"noreferrer noopener\">Cenovus Energy<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The erection of the 23,000-ton structure at West White Rose was completed in just two hours.<\/p>\n","protected":false},"author":9014,"featured_media":278916,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13036],"etiqueta_noticias":[],"class_list":["post-278987","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-oil-and-gas"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/278987","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/9014"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=278987"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/278987\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/278916"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=278987"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=278987"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=278987"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}