{"id":278582,"date":"2025-07-16T15:36:30","date_gmt":"2025-07-16T19:36:30","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/spie-wins-second-contract-with-van-oord\/"},"modified":"2025-07-16T16:16:28","modified_gmt":"2025-07-16T20:16:28","slug":"spie-wins-second-contract-with-van-oord","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/spie-wins-second-contract-with-van-oord\/","title":{"rendered":"SPIE wins second contract with Van Oord"},"content":{"rendered":"\n<p><strong>SPIE<\/strong> Group&#8217;s specialized high-voltage solutions subsidiary <em>Wind Connect<\/em> has secured a new contract with marine engineering firm <strong>Van Oord<\/strong> to execute activities at the Windanker offshore wind farm, located in German waters of the Baltic Sea.<\/p>\n\n<h2 class=\"wp-block-heading\">Wind Connect subsidiary wins second contract<\/h2>\n\n<p>This agreement represents the second collaboration between the two companies and involves the installation and testing of 21 66 kV inter-array cables<em>(IAC<\/em>), which are essential to link the turbines to the marine substation. <strong><a href=\"https:\/\/inspenet.com\/en\/news\/prototype-of-floating-marine-substation\/\" target=\"_blank\" data-type=\"post\" data-id=\"140304\" rel=\"noreferrer noopener\">marine substation<\/a><\/strong>. In addition, it estimates that work will begin in the fourth quarter of 2025 and be completed in the first half of 2026. <\/p>\n\n<p>The <strong><a href=\"https:\/\/inspenet.com\/en\/news\/monopiles-in-eolian-park-marine-windanker\/\" target=\"_blank\" data-type=\"post\" data-id=\"172281\" rel=\"noreferrer noopener\">Windanker<\/a><\/strong>wind farm, with a projected installed capacity of 315 megawatts, is designed to supply more than 300,000 households with renewable electricity. The tasks assigned to <em>SPIE Wind Connect<\/em> are essential to ensure the power flow between the wind turbines and the offshore evacuation infrastructure. <\/p>\n\n<p>The project adds to the growing portfolio of offshore installations in Europe, and he mentioned for its focus on <strong>medium-voltage technologies<\/strong>, such as 66 kilovolt cables, which optimize efficiency in power transmission.<\/p>\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>The award of this contract further strengthens our long-term relationship with Van Oord, one of the world&#8217;s most experienced offshore contractors and a key business partner for our organization.<\/p>\n<cite>Sam Dowey, managing director of SPIE Wind Connect.<\/cite><\/blockquote>\n\n<p>Both companies will continue to cooperate to ensure that the <strong>Windanker wind farm<\/strong> will be operational as planned in 2026, contributing to the European energy transition and decarbonization goals.<\/p>\n\n<p id=\"block-7452d964-8e0e-434c-8722-e283cd8a8d98\"><strong>Follow us on social networks and don&#8217;t miss any of our publications!<\/strong><\/p>\n\n<p id=\"block-e2855ed1-40c2-45d5-8f10-42fa8b26dae2\"><a href=\"https:\/\/www.youtube.com\/@inspenet\" rel=\"nofollow noopener\" target=\"_blank\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" rel=\"nofollow noopener\" target=\"_blank\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" rel=\"nofollow noopener\" target=\"_blank\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" rel=\"nofollow noopener\" target=\"_blank\">Instagram<\/a> <a href=\"https:\/\/x.com\/Inspenetnetwork\" rel=\"nofollow\">X (Twitter)<\/a> <a href=\"https:\/\/www.tiktok.com\/@inspenet?_t=8qqIL6dRGNR&amp;_r=1\" rel=\"nofollow noopener\" target=\"_blank\">TikTok<\/a><\/p>\n\n<p id=\"block-a90af035-7ee7-4f00-80b9-6c97f3d833b3\"><strong>Source and photo: <a href=\"https:\/\/www.spiewindconnect.com\/blog\/news\/spie-scoops-second-contract-with-van-oord\/\" target=\"_blank\" rel=\"noreferrer noopener\">SPIE<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The connection of 21 subsea cables will power the 315 MW Windanker offshore wind farm.<\/p>\n","protected":false},"author":8404,"featured_media":278527,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13044],"etiqueta_noticias":[],"class_list":["post-278582","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-new-energies"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/278582","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=278582"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/278582\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/278527"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=278582"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=278582"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=278582"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}