{"id":278247,"date":"2025-07-15T19:46:21","date_gmt":"2025-07-15T23:46:21","guid":{"rendered":"https:\/\/inspenet.com\/noticias\/sacyr-proyecta-secures-contract-with-fluxys-at-zeebrugge-lng-terminal\/"},"modified":"2025-07-15T21:34:56","modified_gmt":"2025-07-16T01:34:56","slug":"sacyr-proyecta-secures-contract-with-fluxys-at-zeebrugge-lng-terminal","status":"publish","type":"noticias","link":"https:\/\/inspenet.com\/en\/news\/sacyr-proyecta-secures-contract-with-fluxys-at-zeebrugge-lng-terminal\/","title":{"rendered":"Sacyr Proyecta secures contract with Fluxys at Zeebrugge LNG terminal"},"content":{"rendered":"\n<p>The company <strong>Fluxys <\/strong>has once again entrusted <strong>Sacyr <\/strong>with the execution of a new FEED engineering package at the LNG terminal in Zeebrugge, Belgium. This contract strengthens the collaboration between the two companies, consolidating the role of Sacyr&#8217;s technical subsidiary in the European energy transition. <\/p>\n\n<h2 class=\"wp-block-heading\">The Zeebrugge LNG terminal project<\/h2>\n\n<p><em>Fluxys <\/em>&#8216; new order calls for the design of new <strong>seawater vaporizers<\/strong><em>(ORVs<\/em>), associated pumps and a seawater collection system. This assembly will minimize the plant&#8217;s CO\u2082 emissions without compromising its shipping capacity.   <\/p>\n\n<p>Since 2011, <strong>Sacyr Proyecta<\/strong> has played a central role in the development and expansion of this terminal, including the design of the fifth semi-buried tank of 180,000 m\u00b3 and a second jetty that allows transshipment operations between vessels of different drafts. In addition, it led the execution of <strong>boil-off gas<\/strong><em>(BOG<\/em>) handling facilities and the expansion of the regasification capacity to 2.6 million Nm\u00b3\/h. <\/p>\n\n<p><em>Sacyr Proyecta <\/em>&#8216;s continued participation in Zeebrugge is part of its sustainable strategy 24-27, which prioritizes technical solutions for climate mitigation and promotes technologies that reduce environmental impact. The installation of <strong><a href=\"https:\/\/inspenet.com\/en\/news\/strategic-alliance-of-norvento-enerxia-and-enzen-will-supply-renewable-energy-to-guyana-suriname-and-grenada\/\" target=\"_blank\" data-type=\"post\" data-id=\"43228\" rel=\"noreferrer noopener\">ORV systems<\/a><\/strong> systems and new refueling stations for LNG trucks are aimed at a cleaner energy operation. <\/p>\n\n<p>As of today, Sacyr Proyecta maintains an active presence in key projects in Germany, Egypt, France and Spain, including <strong><a href=\"https:\/\/inspenet.com\/en\/news\/clean-energy-increases-gnl-production\/\" target=\"_blank\" data-type=\"post\" data-id=\"163752\" rel=\"noreferrer noopener\">LNG terminals<\/a><\/strong>terminals, <strong>biofuel plants <\/strong>and <strong>gas compression stations<\/strong>. This international expansion underlines its specialization in infrastructure development for the global energy transition. <\/p>\n\n<p id=\"block-7452d964-8e0e-434c-8722-e283cd8a8d98\"><strong>Follow us on social networks and don&#8217;t miss any of our publications!<\/strong><\/p>\n\n<p id=\"block-e2855ed1-40c2-45d5-8f10-42fa8b26dae2\"><a href=\"https:\/\/www.youtube.com\/@inspenet\" rel=\"nofollow noopener\" target=\"_blank\">YouTube<\/a> <a href=\"https:\/\/www.linkedin.com\/company\/inspenetnetwork\" rel=\"nofollow noopener\" target=\"_blank\">LinkedIn<\/a> <a href=\"https:\/\/www.facebook.com\/inspenetnetwork\" rel=\"nofollow noopener\" target=\"_blank\">Facebook<\/a> <a href=\"https:\/\/www.instagram.com\/inspenet\/\" rel=\"nofollow noopener\" target=\"_blank\">Instagram<\/a> <a href=\"https:\/\/x.com\/Inspenetnetwork\" rel=\"nofollow\">X (Twitter)<\/a> <a href=\"https:\/\/www.tiktok.com\/@inspenet?_t=8qqIL6dRGNR&amp;_r=1\" rel=\"nofollow noopener\" target=\"_blank\">TikTok<\/a><\/p>\n\n<p id=\"block-a90af035-7ee7-4f00-80b9-6c97f3d833b3\"><strong>Source and photo: <a href=\"https:\/\/sacyr.com\/-\/sacyr-proyecta-terminal-gnl-zeebrugge-belgica-fluxys\/prensa\" target=\"_blank\" rel=\"noreferrer noopener\">Sacyr<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The new measures are part of Fluxys&#8217; plan to achieve carbon neutral operations.<\/p>\n","protected":false},"author":8404,"featured_media":278228,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"footnotes":""},"categoria_noticias":[13026,13036],"etiqueta_noticias":[],"class_list":["post-278247","noticias","type-noticias","status-publish","has-post-thumbnail","hentry","categoria_noticias-energy","categoria_noticias-oil-and-gas"],"acf":[],"_links":{"self":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/278247","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias"}],"about":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/types\/noticias"}],"author":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/users\/8404"}],"replies":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/comments?post=278247"}],"version-history":[{"count":0,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/noticias\/278247\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media\/278228"}],"wp:attachment":[{"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/media?parent=278247"}],"wp:term":[{"taxonomy":"categoria_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/categoria_noticias?post=278247"},{"taxonomy":"etiqueta_noticias","embeddable":true,"href":"https:\/\/inspenet.com\/en\/wp-json\/wp\/v2\/etiqueta_noticias?post=278247"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}